Laserfiche WebLink
46. That it a sanitary sewer lift station is installed for use by <br />the development and it it is accepted by th• City for <br />maintenance and operation, an agreement shall b• completed <br />between the City and the developer prior to th• approval of <br />the development to the etlect that th• developer will provide <br />a maintenance and operation fund for a minimum ten year <br />period. <br />47. That approval of th• storm drainage system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of th• City Engineer that th• system is <br />adequate, connects to an approved point of discharge, meets <br />any and a21 applicabl• requirements of the Alameda County <br />Flood Control District - Zone 7, meets any and all applicabl• <br />requirements of th• Federal Emergency Management Flood Hazard <br />Program,.and meets the immediate and long-range requirements <br />of this development and all upstream areas intended to be <br />drained through this development. <br />48. That electric power distribution, qa• distribution, <br />communication service, and any required alarm systems be <br />installed underground in a joint utility trench unless <br />otherwise specifically approved by th• City Engineer. <br />49. That the developer be responsfbl• for the installation o! the <br />street lighting system serving the development. The street <br />lights shall be 70 watt, high pressure sodiua vapor units <br />mounted on galvanized steel poles with poured in place bases, <br />on the LS-iC schedule per City requirements and P.G.&E. <br />standard details unless otherwise specifically approved. <br />Approval for the number, location, and type of •lectroliers <br />shall b• withheld pending final design and review by the City <br />Engineer. <br />50. That this development provide a sate and effective <br />circulation system for bicycles and pedestrians. These <br />facilities shall be designed and installed to the <br />satisfaction of the City Engineer and shall be separated from <br />vehicular traffic whenever possible. <br />51. That the developes submit detailed landscape and irrigation <br />plane as part of the improvement plans. These plane should <br />include, where applicable, a street tree planting plan and <br />landscape plans for medians, buffer strips, and any <br />right-ot-way .landscape areas. Th• irrigation plan shall <br />provide for automatic controls. <br />52. That any damage to street improvements now existing or done <br />during construction on the subject property be repaired to <br />the satisfaction of the City.Engineer at full expense to the <br />developer. This shall include slurry seal, overlay, or <br />street reconstruction it deemed warranted by the City <br />Engineer. <br />Rev. 2/84 10/84 5/86 10/86 <br />