My WebLink
|
Help
|
About
|
Sign Out
18 ATTACHMENT 13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
18 ATTACHMENT 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2008 3:38:31 PM
Creation date
1/10/2008 3:28:32 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
18 ATTACHMENT 13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
37. That all existing wells, septic tanks or holding tanks on the <br />site ba properly sealed, filled and abandoned prior to th• <br />start of grading operations unless Zon• 7 retains specific <br />wells for observation wells, or special approval is obtained <br />from th• City Engineer for temporary us• of an •xistinq well <br />for construction water. Any wells designated for abandonment <br />or any wells, encountered during construction, are to be <br />destroyed fn accordance with a permit obtained from Zone 7 by <br />calling (415) 443-9300. <br />38. That the haul route for all materials to and from this <br />development be approved by the City Engineer prior to the <br />start of any construction. <br />39. That the developer submit an erosion and sedimentation <br />control plan or procedure as part o! the improvement plans <br />prior to the final approval of the development. <br />40. That the developer submit a dust control plan or procedure as <br />part of the improvement plane prior to the final approval of <br />the development. <br />41. That storm drainage swalee, gutters, inlets, outlalls, and <br />channels not within the area o! a dedicated public street or <br />public service easement approved by the City Engineer be <br />privately maintained by the property owners or through an <br />association approved by the City. <br />42. That approval of the water supply and distribution system be <br />withheld pending final design and until the developer has <br />demonstrated to the satisfaction of the City Engineer that <br />the proposed system meets both the immediate and long-range <br />requirements for supplying water in this area. <br />43. That the developer comply with any and all applicable <br />requirements of the cross-connections control and backflow <br />prevention device programs required by the California <br />Administrative Code, Title 17. <br />44. That approval for the number, type and location of fire <br />hydrants be withheld pending final design, review by the Fire <br />Marshal, and final review by the City Engineer. <br />45. That approval o! the sanitary sewer system be withheld <br />pending final design and until the developer has demonstrated <br />to the satisfaction of the City Engineer that the proposed <br />system is adequate, connects to an approved point of <br />discharge, and meets both the immediate and long-range <br />requirements of the sanitary system in this and all tributary <br />areas. <br />Rsv. 2/84 10/84 5/86 10/86 <br />
The URL can be used to link to this page
Your browser does not support the video tag.