My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2008 4:49:25 PM
Creation date
1/8/2008 4:44:48 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13 <br />THE CITY OF <br />'= `~'~' °~ ~ ~'~'~ ~"' CITY COUNCIL AGENDA REPORT <br />j~L£~S~NTONo <br />January 15, 2008 <br />Public Works Department <br />TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY VANGUARD <br />CONSTRUCTION FOR ANNUAL CURB AND GUTTER REPLACEMENTS, <br />CIP NO. 065009 <br />SUMMARY <br />Construction of the subject project is complete and is ready for acceptance. The <br />subject project consisted of the removal and replacement of damaged curb, gutter, <br />sidewalk and driveway, and installation of access ramps on streets scheduled for <br />resurfacing. The objective of this project is to improve drainage and pedestrian safety. <br />RECOMMENDATION <br />1. Accept the improvements for this project. <br />2. Authorize the City Clerk to file a Notice of Completion for the subject project. <br />3. Authorize final payment to Vanguard Construction in the amount of $630. <br />4. Authorize payment of the retention in the amount of $33,077.25 to Vanguard <br />Construction thirty days after recordation of the Notice of Completion. <br />5. Authorize the City Manager to transfer the remaining balance of $33,087.50 from <br />the subject project, CIP No. 065009 (Annual Curb and Gutter Replacement), to <br />CIP No. 065005 (Annual Sidewalk/Intersection Ramp Installation). <br />FINANCIAL STATEMENT <br />This project will result in a decrease in the maintenance costs associated with the <br />ongoing repairs of the existing curb and gutter and sidewalk. <br />
The URL can be used to link to this page
Your browser does not support the video tag.