Laserfiche WebLink
ivlarch 23, 2006 <br />Page 7 <br />projects combined fall below the threshold unit count of 500 at which these requirements <br />become applicable. <br />• Cumulative drainage impacts for the three projects (under H. Hydrology and Water Quality) <br />will be reviewed in consultation with staff of the Department of Public Works. <br />^ development of the overall three-project approach; staff/consultant meeting of March 9, 2005 <br />^ preparation of a suitable three-project graphic <br />^ liaison with staff and technical specialists in determining scopes for specific topics <br />^ coordination on general cumulative approach between Lund 2 EIR team and the team for the <br />Oak Grove and Greenbriar/Spotorno projects. <br />^ revision of scope in response to additional information and input from staff <br />• completion of the proposed technical analyses <br />^ editing and distribution of text to EIR teams for integration into the three EIRs <br />^ provision for modest level of revisions at ADEIR stage <br />The proposed budget for the three project cumulative analysis presented on p. 8. <br />Mundie & Associates has undertaken preliminary work on the South Pleasanton three-project <br />cumulative analysis and is prepared to authorize additional technical work and complete the analysis as <br />soon as authorized. <br />1 ~~ ~ i ~ `::r+rrn ~~~ '~tr..x~. ~;:n ~ ,+ii~~::,c t, .ii <br />nnc ~~a~m.r.. ,_. ., _ .~. i it.t_. ~. ;h.!!j rvc; 113-1-tali ,z • F:rn>n!' <br />The budget for the cumulative analysis reflects: <br />