My WebLink
|
Help
|
About
|
Sign Out
09 ATTACHMENT 2
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2008
>
011508
>
09 ATTACHMENT 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2008 4:49:05 PM
Creation date
1/8/2008 4:41:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/15/2008
DESTRUCT DATE
15 Y
DOCUMENT NO
09 ATTACHMENT 2
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Brian•Swift, <br />July 23, 2004 <br />•Page 6 <br />^ tree survey showing existing trees and proposed tree removal (also useful to biology <br />consultant); <br />^ landscape plan; and <br />^ floor plan and elevation drawings for proposed residential buildings. <br />With regard to floor plans, the request assumes that Greenbriar will design and construct <br />the units; i.e., this is not a lot sales program. If this assumption is in error, then an <br />alternative approach to determining the bulk and placement of structures for visual <br />analysis purposes will be developed. <br />Two technical analyses completed for the earlier EIR that will not be revisited are traffic and air <br />quality, as the changes resulting from the proposed site plan revision would be minor and not <br />significant. <br />Mundie & Associates would bring to this assignment outstanding and pertinent skills in CEQA <br />analysis. Support for the environmental analysis would be provided by technical consultants, with <br />whom Mundie & Associates has cordial and constructive relationships from previous projects. <br />• 1 Lead Consutlant <br />The CEQA effort proposed by the Mundie & Associates team would be directed by Roberta Mundie. <br />She has led dozens of CEQA projects, and has particularly sought challenging EIRs that involve <br />important community planning issues. In previous CEQA work for the City of Pleasanton - includ- <br />ing EIRs for the Genera] Plan, the San Francisco PUC's Bernal Property, and the Happy Valley Spe- <br />cific Plan -she has demonstrated skills in defining and analyzing alternatives, preparing cogent and <br />defensible documents, and responding to schedule challenges. <br />Ms. Mundie would be a principal contribution to the analysis, and principal author of the reports. She <br />will be assisted in the EIR by Suzanne Lampert. Ms. Lampert worked closely with Ms. Mundie on the <br />EIRs for the 1998 Happy Valley Specific Plan, the Pleasanton Genera] Plan, and the Bernal Property <br />(San Francisco PUC). <br />Billing rates for Ms Mundie and Ms. Lampert are $150/hour and $147.50/hour, respectively, <br />projected to increase in 1005 by approximately three percent. M&A is currently in the process of <br />recruiting a stafl'associate who might also participate. <br />The City is familiar with our stafT and our experience. We have not, therefore, included firm <br />qualifications or staff biographies. Please advise us if Greenbriar would like additional information: <br />we will be pleased to provide it. <br />Proposal Supplement to EIR, Happy Valley Specific Plan Poge 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.