My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
121807
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2007 3:59:16 PM
Creation date
12/12/2007 3:40:51 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Revision of bulb out locations to balance parking spaces versus utility relocation <br />work. <br />6. Narrowing of the eastbound lanes and sidewalks along one section of Stanley <br />Boulevard (- station 13+00) to minimize right-of-way acquisition from a sensitive <br />property located along the south side of the road. <br />7. KHA developed a "Pro and Con" memorandum that described the issues <br />associated with roadway width, and overlay versus complete pavement <br />reconstruction. <br />Additional Task 2 Amount: $33.982 <br />Reference: 'Backup of Additional Efforts' spreadsheet <br />TASK 3 -UTILITY POTHOLE COORDINATION <br />To assist the City with positive location of existing underground utilities and other buried <br />features that may be in conflict with the new roadway, Kimley-Horn performed the following <br />additional work: <br />1. Creation of schematic utility plans (based on City as-built drawings, topographic <br />mapping, and field reconnaissance) to accompany a potholing request. <br />2. Coordination with Safe-r-Dig and Mountain Pacific Surveys to request price <br />quotes for additional services. <br />3. Prepare contract for Safe-r-dig to perform potholing <br />Additional Task 3 Amount: $2.105 <br />Reference: 'Backup of Additional Efforts' spreadsheet <br />TASK 4 -SANITARY SEWER PLANS <br />This task involves the extension of the existing sanitary sewer from station 20+90 to 25+50. <br />Included are two lateral stubs with clean-outs. Plans, profiles, details, quantities and SSP's will <br />be prepared for this effort. <br />Additional Task 4 Amount: $7.226 <br />Reference: 'Backup of Additional Efforts' spreadsheet <br />TASK 5 -STORM DRAIN DESIGN <br />Storm drain facilities will be incorporated into the project. Assumed for this task are five new <br />inlets, laterals, and two manholes that will tie into the existing drainage system. This task <br />includes drainage layouts, profiles, details, quantities, and SSP's. <br />C:\PROJECTS\Pleasanton -Stanley Blvd\CCO\Sent to George 12-3-07\Stanley Change Order 12-3-2007.doc Page 2 Of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.