My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
121807
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2007 3:59:07 PM
Creation date
12/12/2007 3:37:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BSK <br />EXHIBIT A <br />1181 quarry Lane, Building 350 <br />Pleasanton, CA 94566 <br />(925) 462-4000 • FAX (925) 462-6283 <br />November l9, 20U? <br />ivir. Jim Gotc}ter <br />City of Pleasanton <br />Public Works.'F.ngineering <br />200 Old Bernal Avenue <br />Pleasanton, California 9~56ti-0802 <br />BSK Proposal ;Vo. CP(I7-ZU93 <br />SUBJECT: Proposal <br />Geotechnical Testing/Ohservation & Special Inspection/Testing Services <br />City of Pleasanton, Department of Public Works <br />Bernal Community Park-Sports Fields, Phase 1 <br />Project No. 007065 <br />Dear IVIr. Gotcher: <br />As requested, BSK Associates (BSK) is pleased to subtttit this proposal to provide geotechnical <br />testing and observation, special inspections/materials testing and engineering support services during <br />construction of the subject project. BSK, as Geotechnical Engineer-of-Record, has conducted a <br />subsurface soils im-estigation for the design and construction of this project and submitted a report <br />dated October ~, 20t)_5 (reference BSK Job No. G0~-199-1 1P). <br />1. Project Description, BSK Scope of Services and Proposed ~pproaelr <br />Based on our knowledge of site conditions as Geotechnical Engineer-of-Record <tnd review of your <br />reduest for proposal (RFP ), and project plans and specifications, we understand that the project W ork <br />generally ccrosists of the constntction of a 13.2-acre property tier Phase 1 of Bernal Community Park. <br />The Work includes the ci>nstniction of two (2) lighted baseball fields, one unlighted baseball field, a <br />paved parking lot, public restroom building, aorage building, access roadway and walkways, <br />including the extension of Pleasanton ;~vrnue froth ~~alley .venue, installation of underground <br />IntrASfrUCtUI'C regUlt'Cd tl1 serve the tilhu-e Community Park phases, including storm drainage, and <br />joint utilities. We tiu-ther understand that a great deal of fill material needed to grade the site will be. <br />iabtained from the existing on-site soil stockpiles and other sources which [3SK ;lssociates has <br />already tested the stockpiles for till suitability and related properties. <br />We propose to provide the following scope of services: (1 j collect samples of subgrade, general fill, <br />granular till, road base and trench backtill materials for laboratory moisture/density curve <br />determinations, sieve analyses, classification tests and R-value determination; (2) perti>rn field <br />observations and nuclear field density tests to monitor compaction; (3) provide geotechnical <br />consultation services, as required; (~}} pertorn~ required special inspection and materials testing in <br />accordance with the RFP and project plans and specifications;O document test data and <br />Geotechnical Engineering • Engineering Geology • Environmental Services • Construction Inspection & Testing • Analytical Testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.