My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
121807
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2007 3:59:07 PM
Creation date
12/12/2007 3:37:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/18/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These services are required due to federal, state and local building codes, as well as the <br />project specifications. Since these types of engineering specialties cannot be performed <br />by in-house staff, a consulting engineering firm must be used. <br />A scope of work, which includes a fee estimate by task, was proposed by BSK & <br />Associates (see Attachment 2). Compensation will be on a time and materials basis, <br />with snot-to-exceed amount of $86,240. It is in the City's best interest to have BSK & <br />Associates work directly for the City and coordinate their inspections with those of the <br />City's Construction Manager. <br />SCHEDULE <br />The proposed schedule for the subject project is as follows: <br />Council Award of Construction Contract: 11-06-07 <br />Council Award of Consultant Contract: 12-18-07 <br />Start of Construction: 01-17-08 <br />End of Construction: 01-17-09 <br />Submitted by: <br />/~-~ c~~.2-- <br />Rob Wilson <br />Public Works Director <br />Fiscal Review: <br />IT,~ <~ <br />David P. Culver <br />Finance Director <br />Approve y: <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. Contract with Exhibit A <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.