My WebLink
|
Help
|
About
|
Sign Out
RES 87011
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2012 4:40:39 PM
Creation date
12/9/1999 11:23:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
1/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DES:djk 12/15/86 (#30) <br /> <br />Operation and Maintenance Costs as the Participating Members <br />shall agree. Except when based on estimated flows or other <br />pollutant loadings prior to the first full year of operation of a <br />Facility or Facilities, such flow shall be determined from the <br />total recorded flows and measured loadings obtained from the <br />twelve (12) months prior to March 1 preceding the adoption of the <br />General Budget for an ensuing fiscal year. In the event <br />incomplete or inaccurate records are kept by a Member or Members, <br />the Board shall appoint an Advisory Committee to review the data <br />and determine the appropriate total annual flow or other <br />pollutant loadings. <br /> <br /> Each Party shall be responsible for the professional <br />installation and ongoing professional maintenance of measuring <br />devices and the performance of tests or other collection of data <br />to indicate the amount of wastewater flow or other pollutant <br />loadings generated by a Member. Accurate records pertaining to <br />the measuring devices, tests, or other collection of data shall <br />be maintained by the Party responsible therefore, and such <br />records shall be subject to reasonable inspection by any Party to <br />this Agreement. <br /> <br /> Section 2: Capital Expenditures Budget. Each Party's share <br />of funds required to finance the expenditures to construct a <br />Facility or Facilities for a Project or Projects shall be based <br />upon its anticipated required Capacity Rights over the life of <br />the Facility or Facilities. For the purposes of funding Capital <br />Expenditures, the Authority shall thoroughly review financing <br /> <br /> 3 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.