Laserfiche WebLink
Proposed Operations Service Center Proposal PR86053 <br />Busch Road - Pleasanton, CA December 10, 1986 <br /> Page 4 <br /> <br /> 1. Active and Potentially Active Faults within 100 km <br /> <br /> 2. Earthquake Magnitudes and Peak Ground Motions arising <br /> from Active Faults in the Region <br /> <br /> 3. Calculation of Maximum Credible and Maximum Probable <br /> Earthquake <br /> 4. Seismically Induced Landslides <br /> <br /> 5. Liquefaction Potential <br /> <br /> 6. Seismically induced Settlement <br /> <br /> 7. Ground Lurching <br /> <br /> 8. Inundation Potential <br /> <br /> 9. Tsunamis and Seisches <br /> <br /> 10. Ground Rupture <br /> <br /> EXHibIT <br /> 11. Geologic Setting <br /> <br /> SCHEDULE AND FEES <br /> <br />We would mobilize for this project within three days of your <br />approval and authorization to proceed. We anticipate that the <br />field work would take three days to complete. Our report would <br />be submitted within three weeks following completion of the field <br />exploration. <br /> <br />Our fee for this work will be computed in accordance with our <br />Schedule of Charges (enclosed). Based on this schedule, we <br />estimate that total charges for the scope of work outlined herein <br />would be as follows: <br /> <br /> 1. Soils Investigation <br /> (Field Exploration consisting of approximately <br /> 260 feet of drilling and sampling, Laboratory <br /> Testing, and Evaluation and Report) .... $8,300 - $9,000 <br /> <br /> 2. Geology/Seismic Study (Optional) ........ $1,200 - $1,500 <br /> <br /> Total Range, Investigation and <br /> Geology/Seismic Study): ............... $9,500 - $10,500 <br /> <br /> BSK <br /> <br /> <br />