Laserfiche WebLink
PAGE 1 <br /> <br /> Hopyard Noisewall, Pleasanton <br /> R-901-12 <br /> <br /> 7-7-87 (Rev. 7-14-87) PM PROD MGR ENGR DRAFT CLER OTHER TOTAL <br /> $89 $74 $53 $48 $33 , <br /> TASK HOURS <br /> 1. Topo Survey 8 $2,800 $3,224 <br /> 2. Utility Mapping 8 2 $52 $572 <br />3. Noise Studies $3,100 $3,100 <br />4. Geotechnical Studies 2 4 1 1 $44 $485 <br />5. Two Public Meetings 8 4 8 2 $137 $1,511 <br />6. Prelim Wall Design 8 4 2 $68 $750 <br />7. Right of Entry forms 1 1 $9 $95 <br />8. Prepare P.S. & E. 12 32 48 8 $515 $5,667 <br />9. Project Management 20 $178 $1,958 <br />10. Construction Staking $1,600 $1,600 <br /> <br /> TOTAL $19,000 <br />FILE:R901COST.WKS/123DATA <br /> <br /> REIMER ASSOCIATES <br /> <br /> <br />