Laserfiche WebLink
Joseph Elliott <br />May 14, 1987 <br /> <br /> drawings for storm drainage system will <br /> be provided by our subconsultant). <br /> <br /> d. Soils report by mutually agreed upon firm, <br /> for the purpose of making adequate <br /> recommendation for the amendment of <br /> soi 1/planting. <br /> <br /> e. Landscape Construction Details such as <br /> paving, seatwalls, steps, ramps, trellises, <br /> fencing and gates, wood decking, and park <br /> furniture. <br /> <br /> f. Planting Plan and Details <br /> <br /> g. Irrigation Plan and Details <br /> <br /> 2. Specifications in the standard City of Pleasanton <br /> format: necessary bidding information, General <br /> Conditions of the Contract, and Supplementary <br /> General Conditiors of the Contract and technical <br /> sections. <br /> <br /> 3. Prepare an estimate of probable construction <br /> cost. <br /> <br /> 4. Supply full set reproducible mylars for City <br /> archive. <br /> <br /> 5. Work not included: <br /> <br /> a. Site graphics (excepting one City standard <br /> park sign). <br /> <br /> 6. Fifty sets plans and specifications. <br /> 7. Soils report for planting application. <br /> B. Construction Consultation <br /> <br /> 1. Site Visits: The Landscape Architect shall visit <br /> the site at intervals appropriate to the stage of <br /> construction to become generally familiar with <br /> the progress and quality of the ~Drk and to <br /> determine in general if the work is proceeding in <br /> accordance with the contract documents. However, <br /> the Landscape Architect shall not be required to <br /> make exhaustive or continuous on-site observa- <br /> tions. As a landscape architect, the Landscape <br /> <br /> 2 <br /> <br /> <br />