My WebLink
|
Help
|
About
|
Sign Out
21 ATTACHMENT 09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
21 ATTACHMENT 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2007 2:27:29 PM
Creation date
11/29/2007 12:32:01 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
21 ATTACHMENT 09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f1~ Kin,ieyHorn Supplemental Weekday/NVeekend Traffic Analysis -Final Report <br />^~^ and Associates, inc. Home Depot, Pleasanton, CA <br />Grocery Store <br />• Sat Pass-by Rate - 36% <br />• Sun Pass-by Rate - 36% <br />.................. <br />Fast Food with-Drive Through <br />• Sat Pass-by Rate - 50% <br />• Sun Pass-by Rate - 50% <br />Pharmacy with Drive Through <br />• Sat Pass-by Rate - 49% <br />• Sun Pass-by Rate - 49% <br />Retail <br />• Sat Pass-by Rate - 34% <br />• Sun Pass-by Rate - 34% <br />Weekend Project Trip Distribuficn and Assignment <br />The project trip distribution assumed during the weekday analysis was also assumed for <br />the weekend analysis. It was assumed that approximately 20% of the trips would <br />originate north of the project site, 40% of the trips would originate south of the project <br />site, and 40% of the trips would originate west of the project site. The intersections <br />most likely to be affected by an increase in project traffic would include: <br />• Valley Avenue 8: Busch Road <br />• Stanley Boulevard & Valley Avenue / Bernal Avenue <br />• Bernal Avenue U Vineyard Avenue <br />• First Street ~ Vineyard Avenue <br />The intersections most likely to be affected were determined qualitatively and the level <br />of impact was not detei-rnined per the direction of city staff. <br />ORCHARD ~U6~~~LY H/~RD~;R~ARE <br />Proposed Site User <br />Another option to the Stanley Home Depot is a 40,000 square foot Orchard Supply <br />Hardware store (or si, ~iilar), a 15,789 square foot Pharmacy Drugstore with drive- <br />through, a 5,000 squar:; foot fast food restaurant with drive-through, and 60,500 square <br />feet of retail (an additional 29,000 square feet from what was proposed with the Home <br />Depot land use). <br />Weekday Project Trip ~enerati~,n, Internal Capture, & Pass-by <br />Weekday trip generation <br />land use proposed is an <br />which is based on ITE's <br />shown in Tal/le 13. <br />was calculated for the proposed uses. The only change in <br />Orchard Supply Hardware instead of the Stanley Home Depot <br />grip Generation Hardware/Paint Store land use (LU 816) and is <br />PleasantonHomeDepot08.FinatReport.:ic~ Z1 October 16, 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.