My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
120407
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2007 2:27:28 PM
Creation date
11/28/2007 12:48:40 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
12/4/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br />This project provided for clearing and grubbing, the removal and disposal of the existing <br />fence and associated footings, the installation of temporary fencing for thirteen <br />residences abutting the existing fence, an irrigation system, landscape restoration <br />where necessary, and installation of 947 linear feet of new wood fencing. The existing <br />fence was originally constructed with the Stoneridge Drive interchange, and after <br />previous repairs by the City, was beyond further repair. The replacement fence consists <br />of a low retaining section to support dirt on the residence side of the fence, with a fence <br />height of 6 feet. On the Zone 7 channel and Stoneridge Drive side, the fence height is 8 <br />feet. The fence has been constructed with fence boards on both sides to reduce traffic <br />noise to the existing homes. <br />The project was awarded by City Council on December 5, 2006, to SRP Company of <br />Antioch, California, in the amount of $228,982. At that time, the City Council also <br />authorized the Director of Public Works to approve change orders up to a contingency <br />amount of $45,796. Change orders in the amount of $31,093.91 were issued that <br />provided for additional demolition work, the restoration of existing landscaping and <br />irrigation systems, with the bulk of the work related to repairs of the existing nearby <br />wooden bridge decking. (See Attachment 2 for a project funding and expenditure <br />summary). <br />Submitted by: <br />Fiscal Review: <br />Approve by: <br />Nelson Fialho <br />City Manager <br />Rob Wilson avid P. Culver <br />Public Works Director Director of Finance <br />Attachments: <br />1. Project Location Map <br />2. Funding and Expenditure Summary <br />3. Before and After Project Photographs <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.