My WebLink
|
Help
|
About
|
Sign Out
RES 87278
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87278
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2012 3:29:55 PM
Creation date
12/9/1999 12:22:00 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/7/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF SERVICES <br />The joint-venture team will provide the requested engineering observations and ossociated <br />testing for the various phases of construction for the project when requested by the City of <br />Pleasanton project representative. Mr. James Mullen will coordinate the engineering services <br />with the City of Pleasanton and be responsible for providing the construction documentation <br />required. The scope of services for each phase and the firm responsible for that phase are <br />presented below. <br /> <br />Mass CradincJ Operations (Merrill, Seeley, Mullen, Sandefur, Inc.) We will observe the clearing <br />and grubbing operations including removal of concrete and aspheltic concrete pavement. We <br />will observe scarification, moisture-conditioning and compaction of the exposed subgrade soils <br />prior to placement of fill materials. We will observe the placement and compaction of <br />engineered fill materials including structural backfill in order to evaluate the uniformity of <br />moisture and compactive effort. Field density tests will be taken to confirm our opinions <br />regarding the degree of compaction obtained. <br /> <br />Trench Backfill Operations (Merrillt Seelay, Mullen, Sandefur~ Inc.) We will observe the <br />placement and compaction of beckfill materials for the storm drain, sanitary sewer and water <br />line trenches. Field density tests will be taken to confirm our opinions regarding the degree of <br />compaction obtained. <br /> <br />Pavements (Merrill, Seeley, Mullen, Sandefur, Inc.) We will observe the final subgrade <br />preparation and placement and compaction of the aggregate sub-base and aggregate base <br />materials. Field density tests will be taken to confirm our opinions regarding the degree of <br />compaction obtained. During asphaltic concrete placement, observations and density testing <br />will be provided as requested by the City of Pleasanton. <br /> <br />Pre-Stressed Concrete Pile Fabrication (Signet Testing Labs) We will continuously perform pile <br />fabrication plant inpsection. We estimate approximately one (I) week for completing the <br />fabrication. As part of our inspection services we will provide the following: <br /> <br /> · Check stressing procedures <br /> <br /> · Check strand~ spiral wire and flextube to ensure compliance with design drawings <br /> <br /> · Make concrete cylinders (3/day) <br /> <br /> · Review periodically concrete batching operation and its compliance with the approved <br /> design mix <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.