My WebLink
|
Help
|
About
|
Sign Out
AL FAVELA CONSTRUCTION AUGUSTINE BERNAL WATER MAIN IMPROVEMENTS
City of Pleasanton
>
CITY CLERK
>
LONG TERM AGREEMENT
>
A
>
AL FAVELA CONSTRUCTION AUGUSTINE BERNAL WATER MAIN IMPROVEMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2007 4:00:33 PM
Creation date
11/7/2007 3:44:52 PM
Metadata
Fields
Template:
LONG TERM AGREEMENTS
LONG TERM AGREEMENTS - DOCUMENT DATE
2/27/1985
LONG TERM AGREEMENTS - NAME
AL FAVELA CONSTRUCTION
LONG TERM AGREEMENTS - TYPE
STREET IMPROVEMENT AGMT
LONG TERM AGREEMENTS - RECORD SERIES
704-06
LONG TERM AGREEMENTS - DESTRUCTION DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUGUSTINE STREET AND BERNAL AVENUE WATER MAIN AND STORM DRAIN <br />II4PROVEi9ENTS PROJECT NO. 84-22 <br />ITEt•S UNIT OF ESTIMATED ITEM PRICE TOTAL PRICE <br />PdO. ITEM ~ MEASURE QUANTITY (IN FIGURES) (IN FIGURES) <br /> <br />1. Furnish & install 8" <br /> ACP water main including <br /> excavation, pavement <br /> replacement, valve, <br /> fittings, testiny & <br /> chlorination LF 1, 743 28.55 49, X62:,6:5 __ <br />2. Furnish & install 8" <br /> DIP water main & <br /> valves, fittings, testing <br /> & chlorination including <br /> pavement replacement LF 34 26.15 889.io <br />3_ Furnish & install FH <br /> assembly including <br /> valve, tee and lateral Ea. 2 1,800.00 3,600.00 <br />4. Furnish and install - __-. <br /> 1" water service Ea. 23 200.00 4,600.00 '- <br />5. Furnish at~d install 24" <br /> RCP including excavation <br /> and pavement replacement LF 649 - 45.45 29,497.05 ~~ <br />6. Furnish & install 21" RCP <br /> including excavation & <br /> pavement replacement LF 58 41.10 2,383.80 '~ <br />7. Furnish and insta11~18" <br /> RCP including excavation <br /> & pavement replacement LF 319 <br />36.5o <br />11,643.50 ~-~ <br />8. Furnish and install 15" <br /> RCP including excavation <br /> and pavement replacement LF 93 32.$0 3,050.40 :=' <br />9. Furnish and install 12" <br /> RCP including excavation <br /> and pavement replacement LF 113 29.75 - 3,36i•75~-- <br />10. Construct standard curb <br /> inlet Ea. 8 1,4.00.00 11,200.00 <br />11. Construct standard <br /> storm drain manhole Ea. 5 1,500.00 7,500.00 <br />TOTAL <br />$127.488. 25 .- <br />r. ~t ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.