My WebLink
|
Help
|
About
|
Sign Out
ORD 1961
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
1901 - 2000
>
ORD 1961
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:23:47 PM
Creation date
11/7/2007 2:39:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
11/6/2007
DESTRUCT DATE
PERMANENT
DOCUMENT NO
ORD 1961
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• A Construction Disturbance Coordinator (CDC) shall be designated who will be <br />responsible for responding to ant local complaints regarding construction <br />activities and noise. The DC will determine the cause of the complaint, e.g., <br />starting too early, bad muffler, etc., and will implement reasonable measures to <br />correct the problem. The DC's telephone number on the site shall be <br />conspicuously posted and shall be provided in a notice sent to the neighbors with <br />the construction schedule. <br />(ii) Remaining Impacts. <br />Any remaining impacts related to the temporary increase in noise levels will be less than <br />significant. <br />Public Services: Fire Protection <br />1. Impact on adopted emergency response plan or emergency evacuation plan (pp. <br />230, 230-231 and 375; Condition 58a-58e, 59, and 63 of PUD-33; MMIP M2-1, <br />M2-2, and M2-3). <br />a. Potentiallmpact. <br />The proposed residences lie beyond the Fire Department's five-minute response time, <br />which could affect emergency access to the site. <br />b. Mitigation Measures. <br />The following mitigation measures are hereby adopted and will be implemented as <br />provided for in the Mitigation Monitoring and Implementation Program: <br />• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation <br />Measures M2-1, M2-2 and M2-3. <br />c. Findings. <br />Based on the EIR and the entire record before the City, the City finds that: <br />(i) Effects of Mitigation. <br />The Environmentally Superior Project's potential impacts due to the location of the site <br />in an area at high risk for wildland fires and the location of the proposed residences of <br />proposed residences beyond the Fire Department's five-minute response time will be <br />mitigated to less-than-significant levels through the implementation of the mitigation <br />measures discussed above because the measures require that the approved plan <br />ensure adequate emergency access to the site, that buildings be designed to include <br />fire safety provisions and that it requires the preparation and implementation of a <br />Exhibit A Page 38 of 45 Ordinance No. 1961 <br />PUD-33, Oak Grove <br />
The URL can be used to link to this page
Your browser does not support the video tag.