My WebLink
|
Help
|
About
|
Sign Out
PC-2007-38, PDR-669, CRAIG MIERS
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2007
>
PC-2007-38, PDR-669, CRAIG MIERS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:45 AM
Creation date
11/7/2007 11:36:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/26/2007
DOCUMENT NO
PC-2007-38, PDR-669, CRAIG MIERS
DOCUMENT NAME
PDR-699
NOTES
CONSTRUCT 35,000 OFFICE BLD
NOTES 2
530 BOULDER COURT
NOTES 3
HACIENDA BUSINESS PARK
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
29. There shall be no truck deliveries, parking lot sweeping, or garbage pick-up <br />between the hours of 10:00 p.m. and 6:00 a.m. <br />Green Building <br />30. The subject building shall achieve a minimum LEEDT"' "certified" level on the <br />LEED Green Building Checklist at the time of building permit submittal. A final <br />list of the green building measures shall be submitted in conjunction with the <br />plans submitted for issuance of building permits and shall be subject to the <br />review and approval by the Planning Director prior to issuance of building permits <br />for the project. <br />31. The proposed LEEDTM Green Building Checklist shall be shown on the first or <br />second page of the plans submitted for the issuance of a building permit. The <br />sheet number(s) where each checklist item is addressed in the plan set shall be <br />noted on the checklist. All proposed green building measures shall be shown <br />throughout the plan set, as appropriate, as determined by the Planning Director <br />and the Chief Building Official. <br />32. The Building and Safety Division may require special plan check or inspections for <br />the green building measures proposed. If required, the applicant shall provide <br />verification to the Planning Department clearly stating that the Building and <br />Safety Division approved all applicable requirements relating to green building <br />measures. Said verification shall be provided prior to occupancy. <br />33. The applicant shall implement the following measures with the construction of the <br />structure covered by this approval so that aroof-mounted photovoltaic system <br />can be installed in the future: <br />Install electrical conduit and pull string from the roof/attic areas to the <br />building's main electrical panels; <br />b. Engineer the roof trusses to handle an additional load as determined by a <br />structural engineer to accommodate the additional weight of a prototypical <br />photovoltaic system beyond that anticipated for roofing; and <br />c. Provide an area near the electrical panel for the "inverter" required to convert <br />the direct current output from the photovoltaic panels to alternating current. <br />These measures shall be indicated on the building permit plan sets. <br />BUILDING AND SAFETY DIVISION <br />34. Obtain a building permit from the Building and Safety Division and any other <br />applicable City permits for the project prior to the commencement of any <br />construction. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.