Laserfiche WebLink
Heacox · Crutcher & Associates <br />· Landscape Architecture · Site P~nning · Urban Design · Rec~,eation Planning · <br />1053 Howard Street, Suite 2 San Francisco, CA 94103 (415) 626-4918 <br /> <br />SUTTERGATE GREENWAY <br />Scope of Services <br /> <br />Phase I: Analysis and Evaluation <br /> <br /> A. Attend project start meeting w~th City staff <br /> to collect available data and plan information, <br /> discuss City's objectives for the project and <br /> establish schedule. <br /> B. Conduct a site visit and review available data <br /> to: <br /> <br /> 1. Analyze existing conditions on site} <br /> adjacent land use, circulation patterns, <br /> climatic factors, vegetation and views. <br /> 2. Identify existing utility service systems: <br /> water, sanitary sewer, storm drainage, gas, <br /> electrical and fire control. <br /> C. Attend meeting to obtain information and co- <br /> ordinate with representatives from the following <br /> public agencies: <br /> <br /> 1. Police services; <br /> 2. Fire department; <br /> 3. Park maintenance; <br /> 4. Public Works; <br /> 5. Zone 7, Alameda County Water District. <br /> D. Prepare a site analysis diagram which graphically <br /> illustrates existing conditions and development <br /> opportunities/constraints. <br /> E. Submit site analysis diagram to City staff for <br /> review and comment. <br /> F.Incorporate requested/required revisions per <br /> Item E, above. <br /> G.Attend public hearing to present site analysis <br /> to area residents and neighborhood representatives <br /> for review and comment <br /> H. Attend meeting with City staff to evaluate public <br /> input and ascertain design implications, generate <br /> design criteria and establish a tentative site <br /> development program. <br /> <br /> <br />