My WebLink
|
Help
|
About
|
Sign Out
WORKSHOP REPORT
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
110807
>
WORKSHOP REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2007 12:20:04 PM
Creation date
11/2/2007 12:19:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
11/8/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
WORKSHOP REPORT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ranch State of California and would include up to a maximum of 800 units plus a <br />separate assisted living/skilled nursing/physical therapy facility with an <br />undetermined number of beds/units. The project would be constructed in phases <br />dependent upon City approval and overall interest in the project. The project <br />would be unique to this area and meet the needs of seniors seeking a high <br />quality, full service continuing care environment. <br />C. An approximately 11 acre retail development being developed by Fremont Land, <br />including 106,000 square feet of building area, a food market, bank, restaurant, <br />and shops. <br />D. A 17 acre City community park. <br />E. A five acre site for future potential auto mall expansion or retail/office <br />development. (This property is now being proposed for a neighborhood park.) <br />Consistent with the MOU, Stoneridge Drive would only be extended to the senior <br />continuing care community and the community park. Employees and customers <br />wishing to access the auto mall and commercial uses would use EI Charro Road. A new <br />road, currently called Auto Mall Place, will be developed west of EI Charro Road to <br />access the auto mall, retail center and community park. Emergency vehicle access will <br />be provided from the new portions of Stoneridge Drive to Auto Mall Place. <br />PROJECT STATUS <br />Since the execution of the MOU, staff has been meeting with the three developers <br />regarding development proposals. To date the following has occurred: <br />Approved the Cooperative and Cost Sharing agreements with the City of Livermore, <br />Alameda County, and Vulcan Materials regarding the design and construction of EI <br />Charro Road. <br />Conducted a neighborhood meeting to allow informal interaction and comment with the <br />community on the project. <br />Completed a staff review of development plans from CLC, Hendrick and Fremont Land. <br />Staff anticipates final revisions once final PUD applications are received. <br />Conducted the EIR scoping meeting and completed an initial review of the preliminary <br />draft sections of the project EIR including the traffic study. <br />City Council has authorized staff to meet with San Jose Arena Management group <br />(SJAM) regarding potential use of City park land for a public, recreational ice skating <br />facility. <br />Page 4 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.