My WebLink
|
Help
|
About
|
Sign Out
PC 1970-1029
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1970-1979
>
1970
>
PC 1970-1029
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 1:32:32 PM
Creation date
10/26/2007 3:43:55 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/12/1970
DOCUMENT NO
PC 1970-1029
DOCUMENT NAME
TENETATIVE TRACT MAP 2955
NOTES
SAN RAMON ENGINEERS
NOTES 2
TIME EXTENSION
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
-2- <br />b. Joint circulation shall be provided with the center. <br />c. Site area not necessary for the operation of the station <br />shall be landscaped rather than paved. <br />d. The service station shall be preceded by or developed <br />with the major tenants building in the C-N zone. <br />9. A total sign program for all uses on the C-N site shall <br />be prepared. <br />10. All provisions of Ordinance No. 520 not specifically <br />varied by this approval shall apply. <br />11. That all in-tract easements be granted as public service <br />easements with no reference to specific use. <br />12, That the number, size and location of fire hydrants <br />remain subject to change pending completion of a study of <br />this matter by the Fire Chief. <br />13. That the developer provide all the street lighting <br />facilities necessary to adequately light the streets <br />within and adjacent to this tract at the lowest possible <br />cost to the City. <br />14. That electric power distribution and communication <br />service systems be placed totally underground except for <br />pad-mounted transformers and above-ground splicing cabinets <br />where necessary. <br />15. That sanitary sewer service be provided in this tract <br />by the City of Pleasanton under contract with Valley <br />Community Services District and that all sewer mains within <br />this tract except for trunk mains constructed by V.C.S.D. <br />shall be the property of the City of Pleasanton. <br />16. That approval of the sanitary sewer system be withheld <br />until the developer has demonstrated to the satisfaction <br />of the City Engineer that the proposed system is adequate <br />for the service area and generally meets the immediate and <br />long range requirements of the sanitary sewer system in <br />this and all tributary areas. <br />17. That approval of the water supply and distribution <br />system be withheld until the developer has demonstrated to <br />the satisfaction of the City Engineer that the proposed <br />system meets both the immediate and long range requirements <br />for supplying water in this area. <br />18. That approval of the storm drainage system be withheld <br />until final design calculations have been checked and the <br />developer has demonstrated to the satisfaction of the City <br />Engineer that the system fully meets the requirements of <br />this development and all upstream areas intended to be <br />drained through this tract and that the requirements of <br />Alameda County Flood Control District have been met. <br />19. That the property line radius at the corners of <br />intersections shall be 20 ft, with the exception of the <br />intersection of Payne Avenue with West Las Positas Boule- <br />vard where 40 ft. will be required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.