My WebLink
|
Help
|
About
|
Sign Out
RES 87534
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87534
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 1:45:37 PM
Creation date
12/8/1999 12:52:57 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. The improvement of an area along the east side of the <br /> freeway 680 right-of-way and within the freeway 680 <br /> right-of-way from Bernal Avenue to the Arroyo del <br /> Valle by means of clearing; grubbing; grading; and the <br /> installation of landscaping; irrigation, a project <br /> identification sign; and walkways. <br /> <br /> E. The installation of a system to convey gas and <br /> electricity and for telephone service together with <br /> their appurtenances within Public Utility Easements <br /> adjacent to Koll Center Parkway and Koll Center Drive. <br /> <br /> F. The construction of a sanitary sewer system and its <br /> appurtenances extending from Koll Center Parkway <br /> approximately 600' west to existing sanitary systems <br /> along freeway 680 in two locations. <br /> <br /> G. The construction of a subdrain system and its <br /> appurtenances extending from Koll Center Parkway <br /> approximately 600' west in 2 locations and thence <br /> northerly along freeway 680 approximately 2400' north <br /> to the Arroyo del Valle. <br /> <br /> H. The construction of storm drainage system and its <br /> appurtenances extending approximately 600' westerly <br /> from Koll Center Parkway in 2 locations and running <br /> along the east side freeway 680 from Bernal Avenue to <br /> the Arroyo del Valle including the abandonment of an <br /> existing drainage channel in this area. <br /> <br /> I. The construction of a storm drainage system and its <br /> appurtenances extending approximately 800' north from <br /> Koll Center Park way to the Arroyo del Valle. <br /> <br /> J. The acquisition and/.or performing of all work <br /> auxiliary to any of the above and necessary to <br /> complete the same; together with the payment of all <br /> appropriate incidental expenses of the project. <br /> <br /> This Council finds that the land specially benefited by <br />the improvement is shown within the boundaries of the map entitled, <br />"Proposed Boundaries of Assessment District 1987-1, Koll Center <br />Pleasanton, City of Pleasanton, Alameda County, California." This <br />map has been approved by the City Council and is now on file with <br />the City Clerk. The land within the exterior boundaries shown on <br />the map shall be designated Assessment District 1987-1, Koll Center <br /> <br /> 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.