Laserfiche WebLink
^ To ensure that structures or property is not adversely affected by expansive <br />and/or corrosive soils, the report shall include design standards for the design of <br />the proposed building foundations and improvements, including sidewalks, <br />parking lots, and subsurface utilities, shall incorporate measures to ensure that <br />potential damage due to the shrink/swell potential of the site's soils is minimized. <br />Site soils be tested and evaluated for corrosivity. If corrosive soil conditions are <br />present, the report shall identify the appropriate measures to mitigate these <br />conditions that shall be incorporated into the design of project improvements that <br />may come into contact with site soils. Wherever corrosive soils are found in <br />sufficient concentrations, recommendations shall be made to protect iron, steel, <br />metal, and concrete from long-term deterioration caused by contact with <br />corrosive onsite soils. <br />(ii) Remaining Impacts. <br />Any remaining impacts related to potential unstable expansive and/or corrosive soils soil <br />conditions will be less than significant. <br />4. Unstable soil conditions -potential differential settlement (pp. 148, 151 and <br />363-365; Condition 64-70 of PUD-33; MMIP F4a and F4b). <br />a. Potentiallmgact. <br />Differential settlement at the site could result in damage to buildings and other <br />improvements. <br />b. Mitigation Measures. <br />The following mitigation measures are hereby adopted and will be implemented as <br />provided for in the Mitigation Monitoring and Implementation Program: <br />• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation <br />Measures F4a and Fob. <br />c. Findings. <br />Based on the EIR and the entire record before the City, the City finds that: <br />(i) Effects of Mitigation. <br />The Environmentally Superior Project's potential impacts due to slope instability will be <br />mitigated to less-than-significant levels as the Environmentally Superior Project <br />includes, as conditioned, requirements that Mitigation Measure F4a and Fob be <br />implemented and through the implementation of the following specific actions: <br />Page 30 of 45 <br />