My WebLink
|
Help
|
About
|
Sign Out
RES 87529
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 1:41:44 PM
Creation date
12/8/1999 12:48:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
12/1/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMENDMENT, without prior written authorization from the <br />CITY. Payment shall be made for the amount due for <br />each service rendered during the monthly billing period <br />based on salary costs expended times a multiplier, plus <br />direct expenses. Payment is to be made within 30 days <br />after date of billing. <br /> <br /> For the purpose of payment, the salary costs, mul- <br />tiplier and expenses shall be those rates typically <br />utilized by the CONSULTANT for billing purposes as de- <br />fined in Section E below. <br /> <br /> C. Per Diem. For AMENDMENTS where the Scope of <br />Work cannot be clearly defined, compensation shall be <br />provided on a Per Diem basis. The CITY shall pay the <br />CONSULTANT at the per diem rates shown in EXHIBIT "1", <br />attached hereto and incorporated by reference as if <br />fully set forth herein, plus all direct expenses. The <br />per diem rates shall be revised January 1 of each cal- <br />endar year to reflect estimated salary cost and expenses <br />for the duration of the calendar year. Payment is to <br />be made within 30 days after date of billing, for ser- <br />vices rendered during. the monthly billing period. <br /> <br /> D. Other Compensation. In the event of any le- <br />gal or other controversy requiring the services of the <br />CONSULTANT in providing expert testimony in connection <br />with the PROJECT, except for any actions brought by one <br />party to this AGREEMENT against the other, and except <br />suits or claims by third parties against the CITY aris- <br />ing out of errors or omissions of the CONSULTANT, the <br />CITY shall pay the CONSULTANT for services rendered in <br />regard to such legal or other controversy, including <br />costs of preparation for the controversy, on a basis to <br />be negotiated. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.