Laserfiche WebLink
Task 3-13: Preliminary Electrical Layout <br /> <br />The CONSULTANT will identify points of connection for light- <br />ing traffic signals and irrigation system. <br /> <br />Task 3-14: Memorandum of Understanding <br /> <br />CH2M HILL will prepare a Memorandum of Understanding (MOU) <br />for approval by the City and Caltrans to document areas of <br />agreement. Prior to the start of the final design phase, <br />consultant will assist in the preparation of a Cooperative <br />Agreement. This document will include the results of Task 3 <br />and will also address Caltrans' will formalize the MOU and <br />review comments on Task 3 submittals. <br /> <br />SFR93/060 <br /> <br /> 17 <br /> <br /> <br />