Laserfiche WebLink
Task 3-7: Right-of-Way Engineering <br /> <br />Obtain Caltrans Right-of-Way Maps and assessor parcel maps <br />of the areas adjacent to 1-580 and the interchange areas. <br />Once the project geometrics and right-of-way requirements <br />have been determined, prepare plats and descriptions for the <br />parcels or partial takes required. All plots and descrip- <br />tions will be prepared according to Caltrans format in order <br />to receive timely certification of the Right-of-Way from <br />them. <br /> <br />Task 3-8: Geotechnical Explorations <br /> <br />The geotechnical work items are as follows: <br /> <br /> o Obtain and review existing available geotechnical <br /> reports, geological maps, and reports for the ex- <br /> isting structures and roadways in the area. <br /> <br /> o Obtain from Caltrans the soils investigation data <br /> from their borings or test pits located within <br /> Caltrans' right-of-way. <br /> <br /> o Develop a soils exploration program in conformance <br /> with Caltrans requirements. This will include the <br /> drilling of field borings to view soil conditions <br /> and obtain samples for laboratory analyses. <br /> <br /> o Coordinate laboratory analyses to determine the <br /> necessary physical properties of selected samples. <br /> <br /> o Perform engineering analyses, including considera- <br /> tion of bearing pressures, settlement, seismicity, <br /> earthwork and compaction, site preparation require- <br /> ments, pavement structural sections, and corrosion <br /> potential. <br /> <br /> 13 <br /> <br /> <br />