Laserfiche WebLink
be reviewed and approved by the Planning Director before installation. The <br />sales office/model home shall provide utilities, irrigation, and landscaping. <br />Building Conditions <br />X88. The owner/contractor shalt obtain a building permit from the Division of Building <br />and Safety and any other applicable City permits for the lot development prior to <br />the commencement of any construction including grading. <br />X89. The owner/contractor shall pay any and all fees to which the property may be <br />subject prior to issuance of a building permit. The type and amount of the fees <br />shall be those in effect at the time the building permit is issued. <br />X90. The building permit plan check materials for the individual homes will be accepted <br />for submittal only after the design review approval for the residence becomes <br />effective, unless the owner/contractor submits a signed statement acknowledging <br />that the plan check fees may be forfeited in the event that the ordinance is <br />overturned or that the design is significantly changed. In no case will a building <br />permit be issued prior to the effective date of the ordinance. <br />X91. All structures covered by this approval shall be constructed to: <br />• Meet Title 24 state energy requirements, and <br />• Comply with all codes and ordinances in effect before the Building Department <br />will issue permits. <br />X92. The owner/contractor shall submit two copies of the site soils report to the Chief <br />Building and Safety Official for third party peer review and shall pay for such <br />review at the time specified by the Chief Building and Safety Official, but in all <br />cases before the issuance of a grading permit. <br />81-93. The owner of a residential lot who, whether on his/her own or through a contractor <br />(hereafter, "owner/contractor"), obtains a building permit shall show the proposed <br />green building checklist on one of the first two pages of the plans submitted for <br />the issuance of a building permit. The sheet number(s) where each checklist item <br />is addressed in the plan set shall be noted on the checklist. All proposed green <br />building measures shall be shown throughout the plan set, as appropriate, as <br />determined by the Planning Director and the Chief Building and Safety Official. A <br />special inspection by a representative from the Planning Department shall be <br />coordinated with regards to landscaping, irrigation, and exterior materials. All of <br />the green building measures indicated on the approved checklist shall be <br />inspected and approved by either the City of Pleasanton, a qualified specialist, or <br />the applicant shall provide written verification by the project engineer, architect, <br />landscape architect, or designer. This condition shall appear in the design <br />guidelines. <br />City Council October 2, 2007 Page 38 of 41 <br />