My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
101607
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2007 12:55:42 PM
Creation date
10/11/2007 12:55:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/16/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Development Agreement. The design and operation of the staging area shall <br />include measures to secure the area from sundown to sunrise. The design, <br />operation, and location of the trail staging area, including design features to <br />discourage the use of the area after dusk, shall be subject to the review and <br />approval of the Parks and Recreation Commission and Trails Ad-Hoc Committee. <br />Phasing <br />777. The project shall be allowed to be phased by the processing of phased final <br />maps. Any proposed phasing of this development shall be depicted on the <br />tentative subdivision map and shall include narrative explaining the proposed <br />phasing. Unless a phasing plan for improvements is approved by the Planning <br />Director and the City Engineer, the project developer shall complete all of the on- <br />site improvements at one time. The project developer shall submit improvement <br />plans clearly depicting proposed phasing for review and approval by the City <br />Engineer. All rough-graded areas shall be seeded and kept in a neat and weed- <br />free manner at all times. <br />76:78. If the project is phased, a sign shall be placed at the end of the portion of the <br />project that is phased, notifying residents that the road will be extended. The <br />developer shall submit details of the signage for review and approval prior to <br />installation. <br />School Impacts <br />77:-79. The project developer shall work with the Pleasanton Unified School District and <br />the City Planning Director to develop a program, in addition to the school impact <br />fees required by State law and local ordinance, to off-set this project's long-term <br />effect on school facility needs in Pleasanton. This program shall be designed to <br />fund school facilities necessary to off-set this project's reasonably related effect <br />on the long-term need for expanded school facilities to serve new development in <br />Pleasanton. The method and manner for the provision of these funds and/or <br />facilities shall be approved by the City and in place prior to issuance of building <br />permits. In no event shall construction commence unless the above method and <br />manner for the provision of these funds and/or facilities has been approved by the <br />City. <br />Traffic Mitigation Measures <br />780. The project developer shall implement the following measures to mitigate the <br />development's traffic impacts to the City streets and intersections (Mitigation <br />Measure O-1):: <br />a. Pay $1,000,000 to the City of Pleasanton with the first subdivision map that <br />will be applied to the following: <br />City Council October 2, 2007 Page 32 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.