Laserfiche WebLink
future annual GHAD assessments for the development. (Mitigation Measure F-2- <br />c of the FEIR) <br />X72. The developed project site -privately-owned and publicly-owned -shall be <br />maintained through an ongoing Slope Management Program (SMP) and a Plan <br />of Control (POC), administered by the Geologic Hazard Abatement District <br />(GHAD). The project developer shall submit the SMP and POC, prepared by an <br />approved geotechnical consulting firm with budgets and assessments funding the <br />GHAD to the City Engineer for review and approval prior to approval of the final <br />subdivision map for this development. (Mitigation Measure F-2-c of the FEIR) <br />Hydrology and Water Quality <br />773. To mitigate the creation of new impervious surfaces that would increase the <br />amount and/or the intensity of runoff, potentially exacerbating existing <br />downstream flooding problems and/or causing hydro modification impacts, the <br />project developer (for the infrastructure) and/or lot owner/contractor (for the <br />individual lots) shall pay the applicable regional drainage fees to the Alameda <br />Water Quality and Flood Control District, Zone 7, at the final map for impervious <br />road surfaces (project developer) and with each building permit for lot <br />development (lot owner/contractor). (Mitigation Measure H-1-b of the FEIR) <br />Open Space Area <br />7z?74. The property owner shall dedicate in fee title to the City of Pleasanton or to <br />another public entity selected by the City the open space area surrounding Lots 1 <br />through 51 with recordation of the first final subdivision map. The open space <br />area shall be subject to an open space/conservation easement granted to the Tri- <br />Valley Conservancy or other organization authorized to hold open <br />space/conservation easements, and shall be in accordance with the <br />requirements of the Development Agreement. Funding for the conservation <br />easement, including maintenance, will be resolved with the final map. The <br />developer and/or other source shall contribute the funding; the -City will not be <br />required to contribute. <br />X75. Before the sale of the fifth lot, the project developer shall install local and regional <br />public trails in the open space area generally following the alignments shown in <br />Exhibit I, dated March 2007 in accordance with the requirements of the <br />Development Agreement. The location of the trails shall be subject to the review <br />and approval of the Parks and Recreation Commission and Trails Ad-Hoc <br />Committee. The trails' locations shall avoid the environmentally sensitive areas <br />designated on the approved mitigation monitoring plans. <br />74-.76. Before the sale of the fifth lot, the project developer shall install a public trail <br />staging area in the open space area, generally located in the area by the <br />proposed City water tank, in accordance with the requirements of the <br />City Council October 2. 2007 Page 31 of 41 <br />