My WebLink
|
Help
|
About
|
Sign Out
PC 2006-55
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-55
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:32 AM
Creation date
10/2/2007 11:45:21 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/18/2006
DOCUMENT NO
PC 2006-55
DOCUMENT NAME
PUD-99-7-3M / PDR-578
NOTES
DONALD BABBITT/HEARTWOOD COMMUNITIES
NOTES 2
MAJOR MOD -DESIGN GUIDELINES, 7,128SQ FT SFR
NOTES 3
LOT 8, HAPPY VALLEY RD & ALISAL ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
offset program and unless the project developer is participating in the program. <br />Notwithstanding the project developer's participation in such a program, the City may <br />withhold building permits if the City determines that sufficient water is not available at <br />the time of application of building permits. <br />9. The project developer shall work with the Pleasanton Unified School District and the <br />City Planning Director to develop a program, in addition to the school impact fees <br />required by State law and local ordinance, to off-set this project's long-tertn effect on <br />school facility needs in Pleasanton. This program shall be designed to fund school <br />facilities necessary to offset this project's reasonably related effect on the long-term need <br />for expanded school facilities to serve new development in Pleasanton. The method and <br />manner for the provision of these funds and/or facilities shall be approved by the City and <br />in place prior to approval of the final map. In no event shall construction commence <br />unless the above method and manner for the provision of these funds and/or facilities has <br />been approved by the City. <br />10. The building permit plan check materials will be accepted for submittal only after <br />completion of the 20-day appeal period, measured from the date of the approval letter, <br />unless the project developer submits a signed statement acknowledging that the plan <br />check fees may be forfeited in the event that the approval is overturned on appeal, or that <br />the design is significantly changed as a result of the appeal. In no case will a building <br />permit be issued prior to the expiration of the 20-day time-period. <br />Planning Requirements: <br />11. Prior to first framing inspection, the height of the primary structure shall be surveyed <br />and verified as being in conformance to the approved building height of 12 feet for the <br />one-story potion and 29.5 feet for the two-story portion measured from the lowest grade. <br />That includes the height with the finish roof material and ridge caps. Said verification is <br />the project developer's responsibility. <br />Prior to receiving a foundation inspection for the structure, the applicant shall submit <br />a pad elevation certification prepared by a licensed land surveyor or registered civil <br />engineer to the Chief Building Official and Planning Director, certifying that the pad <br />elevations and building setbacks are pursuant to the approved plans. <br />12. The proposed outdoor lighting for the subject property shall be of low intensity and <br />shielded in order to minimize its visibility from off-site. Outdoor lighting shall also not <br />glare onto adjacent properties or streets. Exterior lighting shall use the lowest wattage <br />and shall limit the number of fixtures to attain the lowest luminosity. <br />13. The applicant shall submit a waste management plan to the Building and Safety Division <br />prior to issuance of building or demolition permits. The plan shall include the estimated <br />composition and quantities of waste to be generated and how the project developer <br />intends to recycle at least 50 percent of the total job site construction and demolition <br />waste measured by weight or volume. Proof of compliance shall be provided to the Chief <br />
The URL can be used to link to this page
Your browser does not support the video tag.