Laserfiche WebLink
21. The approved house colors/materials shall be indicated on the final building permit plans. <br />Any proposed revisions to these approved colors or materials must be submitted for <br />review and approval by the Planning Director prior to painting/installation. <br />22. Prior to building permit submittal, a list of the green building measures used in the design <br />of the home covered by this approval shall be provided to the Planning Department for <br />the review and approval by the Planning Director. The home covered by this approval <br />shall be designed to achieve a minimum of 50 points using the ACWMA's Green Points <br />rating system. The proposed project shall be a "green home" with a minimum of 10 <br />points in each category (Resources, Energy, and IAQ/Health). The green building <br />measures shall be shown on one of the first two pages of the plans submitted for issuance <br />of a building permit. Each point identified shall have a notation showing which sheet the <br />item can be found. A special inspection by a representative from the Planning <br />Department shall be coordinated with regards to landscaping, irrigation, and exterior <br />materials. All of the green building measures indicated on the approved checklist shall <br />be inspected and approved by either the City of Pleasanton, a qualified specialist, or the <br />applicant shall provide written verification by the project engineer, architect, landscape <br />architect, or designer. <br />23. The main structure shall be constructed to allow for future installation of a Photo Voltaic <br />(PV) system. The project/ building developer shall comply with the following <br />requirements for making all houses on the lot photo voltaic ready. Making the home <br />photovoltaic ready shall require the following measures to be implemented with the <br />construction of the structures covered: <br />a. Electrical conduit and pull strings shall be installed from the roof/attic area to the <br />buildings' main electrical panels. <br />b. Roof trusses shall be engineered to handle an addition load of five (5) pounds per <br />square foot beyond that of the anticipated load for the roofing material. <br />c. An area shall be provided near the electrical panel for the "inverter" required to <br />convert the direct current output from the photovoltaic panels to alternating current. <br />24. Final inspection by the Planning Department is required prior to occupancy of the <br />dwellings. <br />Landscaping and Irrigation System Design and Operation: <br />25. A final landscape plan and irrigation plan shall be submitted to and approved by the <br />Planning Director as part of the building permit plan set prior to issuance of an on-site <br />permit. Said landscape plan shall be consistent with the approved landscape plan, <br />including planting details in terms of species, location, size, quantities, and spacing. <br />4 <br />