Laserfiche WebLink
13. The height of the structures shall be surveyed and verified as being in conformance to the <br />approved building height as shown on Exhibit A or as otherwise conditioned. Said <br />verification is the project developer's responsibility, shall be performed by a licensed land <br />surveyor or civil engineer, and shall be completed and provided to the Planning <br />Department before the first framing or structural inspection by the Building and Safety <br />Division. <br />14. The applicants shall submit a pad elevation certification prepared by a licensed land <br />surveyor or registered civil engineer to the Chief Building Official and Planning Director, <br />certifying that the pad elevations and building locations (setbacks) are pursuant to the <br />approved plans, prior to receiving a foundation inspection for the structure. <br />15. This development shall be considered as a "first-come, first-served" project for growth <br />management purposes. <br />16. Wood-burning fireplaces shall be prohibited. Natural gas-fired fireplaces, EPA-certified <br />wood fireplaces or heaters, and wood pellet-fueled heaters and fireplace inserts shall be <br />allowed. <br />17. The project developer shall provide all buyers with copies of the project conditions of <br />approval. <br />18. Details and sections of the siding installation, door trim, and window treatments (sill, <br />trim, frame, sash, mullion, window recess, etc.) shall be shown on the building permit <br />plans and shall be subject to review and approval by the Planning Director prior to <br />issuance of a building permit. <br />19. The project developer shall submit a final exterior lighting plan for the project for the <br />review and approval of the Planning Director prior to issuance of building permits. All <br />exterior lighting shall be directed downward and designed or shielded so as to not shine <br />on neighboring properties. The applicant shall submit a final lighting plan, and include <br />drawings and/or manufacture's specification sheets showing the size and types light <br />fixtures proposed for the exterior of the buildings and parking areas. The light fixtures <br />and their locations shall be subject to the review and approval of the Planning Director. <br />20. All conditions of approval shall be attached to all building permit plan check sets <br />submitted for review and approval. These conditions of approval shall be attached at all <br />times to any grading and construction plans kept on the project site. It is the <br />responsibility of the applicant/property owner to ensure that the project contractor is <br />aware of, and abides by, all conditions of approval It is the responsibility of the <br />applicant/property owner to ensure that the project landscape contractor is aware of, and <br />adheres to, the approved landscape and irrigation plans, and all conditions of approval. <br />Prior approval from the Planning Department is required before any changes are <br />constituted in site design, grading, house design, house colors or materials, fence <br />material, fence location, landscape material, etc. <br />3 <br />