Laserfiche WebLink
54. The project developer shall submit a building survey and/or record of survey and a site <br />development plan in accordance with the provisions of Chapter 18.68 of the Municipal <br />Code of the City of Pleasanton. These plans shall be approved by the Chief Building <br />Official prior to the issuance of a building permit. The site development plan shall <br />include all required information to design and construct site, grading, paving, drainage, <br />and utilities. Specific items to be indicated on the site development plan necessary to <br />construct the improvements are to be in accordance with the City of Pleasanton Private <br />Development Design Guidelines adopted April 15, 1986. <br />55. All retaining walls higher than four-feet from the top of the wall to the bottom of the <br />footway shall be constructed of reinforced concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall plans. <br />56. The project developer shall submit plot plans for each of the residential lots showing <br />building setbacks and a topographic plan showing grading and drainage. Pad elevations, <br />finish floor elevations, retaining walls, easements, and maximum height of the highest <br />structure are to be indicated on the plan. Plans for custom lots are to be signed by a <br />registered civil engineer. All residential plot plans shall show compliance with 2907(d) <br />and 70012(d) of the Uniform Building Code. <br />57. Unless otherwise required and/or permitted, the project developer shall submit two copies <br />of the site soils report to the Chief Building Official for third party peer review and shall <br />pay for such review at the time specified by the Director, but in all cases before the <br />issuance of a grading permit. <br />58. The project developer shall submit record tract grading plans showing: <br />a. The elevation of all four corners of the lot as well as the center of the lot; <br />b. all top and toe of slope elevations, and, <br />c. the top and toe of all retaining wall elevations. <br />59. The record-grading plan is to be submitted to the Chief Building Official before the first <br />house final. <br />60. The soils engineer shall certify the pad compactions of all lots containing fill to the <br />satisfaction of the Chief Building Official prior to the issuance of building permits. <br />Construction Requirements: <br />61. All site improvements and house construction activities shall be limited to the hours of <br />8:00 a.m. to 5:00 p.m., Monday through Friday. The Planning Director may, on a case- <br />by-case basis, approve modified construction days and/or hours upon written request by <br />the project developer. All construction equipment must meet Department of Motor <br />Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br />12 <br />