Laserfiche WebLink
b) All cut and fill slopes shall be revegetated and stabilized after completion of grading, but in no <br />case later than October 15. Hydroseeding shall be accomplished before September 15 and <br />irrigated with a temporary irrigation system to ensure that the grasses are established before <br />October 15. No grading shall occur between October I S and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of City <br />Engineer/Chief Building Official. Such measures shall be maintained until such time as <br />permanent landscaping is place. <br />c) Gather all construction debris on a regular basis and place it in a dumpster or other container <br />which is emptied or removed on a weekly basis. When appropriate, use tarps on the ground <br />to collect fallen debris or splatters that could contribute to storm water runoff pollution. <br />d) Remove all dirt, gravel, rubbish, refuse, and green waste from the street pavement and storm <br />drains adjoining the site. Limit construction access routes onto the site and place gravel on <br />them. Do not drive vehicles and equipment off paved or graveled areas during wet weather. <br />Broom-sweep the street pavement adjoining the project site on a daily basis. Scrape caked- <br />on mud and dirt from these areas before sweeping. <br />e) Install filter materials (such as sandbags, filter fabric, etc.) at the storm drain inlet nearest the <br />downstream side of the project site in order to retain any debris or dirt flowing in the storm <br />drain system. Maintain and/or replace filter materials to ensure effectiveness and to prevent <br />street flooding. <br />f) Create a contained and covered area on the site for the storage of bags, cement, paints, oils, <br />fertilizers, pesticides, or other materials used on the site that have the potential of being <br />discharged into the storm drain system through being windblown or in the event of a material <br />spill. <br />g) Never clean machinery, equipment, tools, brushes, or rinse containers into a street, gutter, <br />or storm drain. <br />h) Ensure that concrete/gunite supply trucks or concrete/plaster operations do not discharge <br />wash water into street, gutters, or storm drains. <br />{endj <br />