My WebLink
|
Help
|
About
|
Sign Out
PC 2006-23
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2000-2009
>
2006
>
PC 2006-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2008 10:37:31 AM
Creation date
10/2/2007 10:19:09 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/26/2006
DOCUMENT NO
PC 2006-23
DOCUMENT NAME
PUD-99-14
NOTES
KAZUO & TAKIKO HATSUSHI
NOTES 2
13 NEW SFR
NOTES 3
2756, 2770 & 2798 VINEYARD AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution No. PC-2006-23 <br />Page Two <br />The proposed development plan is consistent with the City's General Plan. <br />The Vineyard Avenue Corridor Specific Plan was developed to implement the City's <br />General Plan for the Vineyard Avenue Corridor Specific Plan Area. The Specific Plan <br />has been found to be consistent with the General Plan policies including development <br />outside 100-year flood zone azeas, development on stable soils, and densities consistent <br />with surrounding properties. Mitigation measures specified by the Specific Plan <br />applicable to the proposed project, e.g., fresh air ventilation and/or air-conditioning <br />system that allows residents to maintain closed windows for noise and dust control, dual <br />paned windows, disclosure clauses and statements, etc., are addressed with draft <br />conditions of approval. Therefore, this finding can be made. <br />The proposed development plan is compatible with previously developed <br />properties located in the vicinity of the plan. <br />The project site is an infill property surrounded by a variety of existing residential homes. <br />The proposed development plan incorporates numerous provisions -limitations on <br />building heights, setbacks, maximum floor azea, etc., - to integrate the design of the <br />planned buildings on these lots with the nearby single-family homes and surrounding <br />area. <br />All public streets approved for this site by the Vineyard Avenue Corridor Specific Plan <br />would be constructed by the project developer. The proposed public streets are located in <br />a manner which is consistent with the Vineyard Avenue Corridor Specific Plan, with City <br />standazds, and which provides two points of access to the proposed development for <br />access and/or emergency vehicle access purposes. <br />All house construction activities are limited to the hours of 8:00 a.m. to 5:00 p.m., <br />Monday through Friday. All construction equipment must meet Department of Motor <br />Vehicles (DMV) noise standards and shall be equipped with muffling devices. <br />Therefore, this finding can be made <br />4. The proposed development plan is compatible with previously developed <br />properties located in the vicinity and the natural, topographic features of the site. <br />The proposed development plan is designed to reflect the site's existing topographic <br />condition, to minimize impacts on adjoining properties, and to be consistent with the <br />requirements and geotechnical report recommendations that have been prepazed for the <br />proposed project. Although the proposed lots are predominantly flat-pad lots, graded <br />areas are minimized. The location and configuration of the proposed lots and public <br />streets generally follow natural contours. All private lots will be designed to drain to <br />bio-retention areas designed to pre-treat stormwater runoff before entering the City's <br />storm drain system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.