My WebLink
|
Help
|
About
|
Sign Out
11 ATTACHMENT 4
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2007
>
100207
>
11 ATTACHMENT 4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/28/2007 12:32:25 PM
Creation date
9/25/2007 1:34:36 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
10/2/2007
DESTRUCT DATE
15 Y
DOCUMENT NO
11 ATTACHMENT 4
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(ii) Remaining Impacts. <br />Any remaining impacts related to the risk of degradation of water quality in nearby <br />surface water bodies will be less than significant. <br />Noise <br />21. Construction period: effect of the project on the setting (pp.206-208, 208-209 and <br />370-372; Condition 19-20 of PUD-33; MMIP J1). <br />a. Potentiallmpact. <br />Development of the Environmentally Superior Project could temporarily increase noise <br />levels and could be annoying at times. <br />b. Mitigation Measures. <br />The following mitigation measure is hereby adopted and will be implemented as <br />provided for in the Mitigation Monitoring and Implementation Program: <br />• Implement Oak Grove Planned Unit Development (PUD-33) Mitigation Measure <br />J1. <br />c. Findings. <br />Based on the EIR and the entire record before the City, the City finds that: <br />(i) Effects of Mitigation. <br />The Environmentally Superior Project's potential impacts due to construction noise will <br />be mitigated to less than significant levels through the implementation of the mitigation <br />measures discussed above because the measure requires the PUD Development Plan <br />conditions to incorporate noise reduction requirements, including limits on the hours of <br />construction activity and best management practices for construction noise. Further, the <br />Environmentally Superior Project includes, as conditioned, contains requirements that <br />the project developer and/or future building developers shall complete the specific <br />actions: <br />• All subdivision improvements and site improvements and house construction <br />activities shall be limited to the hours of 8:00 a.m. to 5:00 p.m., Monday through <br />Friday. The Planning Director may authorize on a case-by-case basis alternate <br />construction hours for specific activities including concrete work, asphalt work, <br />etc. <br />• To mitigate construction impacts to the surrounding properties adjoining the north <br />and west sides of the Oak Grove property, the project developer shall prepare a <br />Construction Best Management Plan (CBMP) for the review and approval by the <br />City before the City's action on the first Final Subdivision Map. The CBMP shall <br />Page 35 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.