Laserfiche WebLink
55. Utility services and irrigation lines shall be located outside of the root protection <br />zones of the trees to be preserved. (Mitigation Measure D-10 of the FEIR.) <br />56. The project developer shall retain the services of a certified consulting arborist to <br />monitor the project site and the health of the trees to be preserved during <br />construction and grading activity. A modified form of this condition applicable to <br />the developer of individual lots shall appear in the design guidelines. (Mitigation <br />Measure D-10 of the FEIR.) <br />57. The Planning Director and the City Engineer shall be notified by the consulting <br />arborist on-site of any damage that occurs to an existing tree designated to be <br />preserved during construction so that proper treatment and/or replacement may <br />be administered. Replacement shall be based on the tree's valuation set forth in <br />the HTMP and shall be administered as replacement trees or payment of funds <br />to the City's Urban Forestry Fund, or both. A modified form of this condition shall <br />appear in the design guidelines to address the existing trees on private lots. <br />(Mitigation Measure D-10 of the FEIR) <br />Fire Safety and Mitigation Measures <br />58. The Oak Grove development is located in the "Special Fire Protection Area" <br />noted in the Pleasanton General Plan; is located outside the five-minute <br />response time standard; and is located in a high wildland fire hazard area. For <br />this reason, the project developer and/or future lot owner/contractors shall be <br />subject to the following requirements as reviewed and approved by the Fire <br />Marshall: <br />a. All residential structures, detached garages, cabanas, secondary dwelling <br />units, etc., on the development covered by this and future approvals shall be <br />equipped with automatic fire sprinkler protection. Plans and specifications for <br />the automatic fire sprinkler system(s) including the alarm system, waterflow <br />and valve tamper, etc., shall be submitted to the Building and Safety Division <br />for distribution to the Livermore-Pleasanton Fire Department for review and <br />approval prior to installation. All required inspections and witnessing of tests <br />shall be completed prior to final inspection and occupancy of the building(s). <br />(Mitigation Measure M-2-2 of the FEIR) <br />b. If the project is phased, Lots 1 through 7 may be developed without the new <br />water tank, without the construction of the fire access road to/from the water <br />tank within the Kottinger Ranch property and without the construction of the <br />public access easement from Grey Eagle Court to the northern property line <br />of the Project site. The remaining lots, Lots 8-51, may be developed only with <br />the new water tank operational, the fire access road constructed or under <br />construction, and the public access easement constructed or under <br />construction due to the waterline loop required to service the new water tank. <br />Prior to the issuance of a building permit for a new residence on any lot <br />covered by this approval, the project developer shall provide adequate fire <br />Page 22 of 3 7 <br />