Laserfiche WebLink
Twenty-three (24) lots - 47.1 percent -would allow between 8,003 square feet <br />and 8,840 square feet of building area. <br />Seventeen (17) lots - 33.3 percent -would allow between 9,020 square feet and <br />9,897 square feet of building area. <br />Four (4) lots - 7.8 percent -would allow between 12,362 square feet and 12,500 <br />square feet of building area. <br />Modify Condition 58.c. as follows: <br />The project developer shall construct the fire access routes to the proposed <br />development: <br />• The first route shall be a 20-foot wide fire access road capable of supporting a <br />Tvpe 3 fire vehicle and forming a loop continuing the driveway from "A" Street <br />past Lot 51 to connect to the existing tank access road within Kottinger Ranch. <br />This EVA will function as a fire access road and will be constructed of <br />decomposed granite or similar material to blend with surrounding terrain. <br />• The second route shall connect to the CitYs existing access easement (as said <br />easement may be relocated) within the Grey Eagle Estates (GES) subdivision. <br />This fire access road shall involve improving an existing access and public <br />service easement and will connect the cul-de-sac of Grey Eagle Court to the <br />north project property line as follows: <br />o From the GES cul-de-sac, the existing improvements (which extend about <br />130 feet) shall remain as constructed; from the end of those improvements, <br />the easement may be relocated to accommodate a proposed driveway and <br />residence on the Roberts' property. This relocated easement shall serve, in <br />part, as a driveway to the proposed Roberts' residence. This portion of the <br />easement, the location of which must be acceptable to the City of Pleasanton <br />and to Roberts, shall be 20 feet wide and shall be an all weather surface to <br />the extent that it serves as a driveway. The project developer shall bear the <br />incremental cost to increase the width of the driveway from 14 feet to 20 feet. <br />o The remaining portion of the easement (about 120 feet in length) that <br />connects the easement/driveway to the north proiect property line shall be in <br />a location acceptable to the City of Pleasanton and Roberts, shall be 12 feet <br />in width, and shall be improved with a surface material acceptable to the Citv <br />of Pleasanton and Roberts. The proiect developer shall bear the incremental <br />cost to increase the structural integrity of this portion of the easement to <br />accommodate the weight of a Type 3 fire vehicle. <br />o In the event that the City of Pleasanton and Roberts are unable to agree on <br />the relocation of the existing easement, its width(s), or the surface materials <br />thereof, then the proiect developer shall improve the existing easement to the <br />satisfaction of the City of Pleasanton. The proiect developer shall also <br />construct an electronically controlled gate, as approved by the City of <br />Pleasanton, at or near the common property line between the proiect site and <br />the Grey Eagle Estates subdivision to prevent the egress of persons and <br />