My WebLink
|
Help
|
About
|
Sign Out
RES 87438
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:12:17 AM
Creation date
12/7/1999 12:04:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Joe Elliott BISSELL & KARN. INC, <br />July 22, 1987 <br />Page 2 <br /> <br /> o Prepare a construction cost estimate. <br /> <br /> o Review operation of the velocity shutoff valve on the Foothill <br /> Reservoir outlet line. Recommend adjustment or modification as <br /> appropriate. <br /> <br />Project 2. Booster pu~p investigation, design and specification. <br /> <br />This project would involve the work necessary to make final determination of <br />the new and/or modified individual booster pump installations that will be <br />required for those houses to be shifted from the Foothill Zone to the Lower <br />Zone, and to detail those installations. Specific tasks would be as <br />follows: <br /> <br /> o Working with city staff, perform additional testing to verify and <br /> supplement the work previously done CDM. This would include <br /> pressure measurements at all locations recommended for new or <br /> modified booster pumps, with the system on the Foothill Zone and <br /> with it shifted to Lower Zone pressure. <br /> <br /> o Review impacts on fire protection for the area. Check existing <br /> fire flow capabilities (with the main line connected to the <br /> Foothill Zone) and calculate impact based on pressure <br /> measurements. <br /> <br /> o Determine specific modifications and/or new pump requirements. <br /> Obtain and review pump curves for existing pumps where available; <br /> obtain operating data where curves are not available. Determine <br /> which pumps can be modified and which must be replaced. Develop <br /> typical installation details and specification. <br /> <br /> o Work with City staff to establish a schedule for pump <br /> mMifications and installations, and final shift to the Lower <br /> Zone. This schedule would include scheduling the installation of <br /> the check valves from Project 1, above. <br /> <br />We propose to contract for this work on lump sum basis, however, we would be <br />willing to accept an hourly rate contract or other form of contract at the <br />City's option. Our proposed lump sum fees for the two projects as described <br />above are: <br /> <br /> Project 1:$2,500 <br /> <br /> Project 2:$4,500 <br /> <br />WDP.6.11 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.