My WebLink
|
Help
|
About
|
Sign Out
RES 87438
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1987
>
RES 87438
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2012 10:12:17 AM
Creation date
12/7/1999 12:04:04 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
10/6/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BISSELL & KARN. INC <br /> <br />Mr. joe E11 i ott <br />August 3!, 1987 <br />Page 2 <br /> <br /> o Review data and develop a preliminary evaluation of the causes of <br /> the service line failures. <br /> <br /> o Meet with City staff to review and refine the preliminary <br /> evaluation, and to obtain additional data if required. <br /> <br /> o In conjunction with City staff, perform field testing is required. <br /> <br /> o If necessary, develop a computer model of the Bonde Zone as a <br /> supplement or as an alternative to field testing. Depending on <br /> evaluation to this point, this could be either a steady state model <br /> to evaluate performance over the range of pump and reservoir <br /> operation, or a transient analysis to identify surge problems <br /> associated with pumps starting and stopping. <br /> <br /> o Make a final determination of the cause of the problems and develop <br /> recommendations for appropriate corrective measures, as needed. <br /> <br />The results of each task would be reviewed with City staff as the work <br />progresses and work would be limited as determined by the staff. A brief <br />report outlining our recommendations would be prepared and reviewed with <br />City staff prior to finalizing. <br /> <br />ESTIMATED FEE AND SCHEDULE <br /> <br />We propose to contract for this work on a time and materials basis. It is <br />difficult to determine the extent of work required at this time, however, <br />the following figures may be used for budgeting. The actual extent of the <br />work required, and resulting costs, will depend largely on the complexity of <br />the problem. <br /> <br /> Items of Work Estimated Fee <br /> <br /> Meetings, data review, site visit <br /> sketch map and preliminary evaluation. $ 1,500 <br /> <br /> Field testing and evaluation. 1,500 <br /> <br /> Develop steady state model and test <br /> system performance. 1,500 <br /> <br /> Develop transient model and test <br /> system performance. 1,500 <br /> <br /> Final recommendations and report. 1,O00 <br /> <br />LCP.IO.4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.