Laserfiche WebLink
Ms. Decker noted that the following modifications to the conditions be added for <br />clarification: <br />1. Modify the first sentence of Condition No. 20 to read as follows: “…a <br />temporary six-foot-tall chain link fence or approved equivalent shall be <br />installed around the trees as a protective measure….” <br />2. Delete Conditions Nos. 30 and 31 because the building should already meet <br />Title XXIV for State energy requirements and comply with all codes for <br />structural requirements before building permit issuance. <br />3. Modify the first sentence of Condition 33 to read as follows: “The project <br />developer shall submit a plot plan plot plans for each of the residential lot <br />lots….” <br />4. Modify Condition No. 37 to delete reference to Saturday construction hours. <br />5. Modify the first sentence of Condition No. 47 to read as follows: “Except <br />otherwise approved by the Fire Marshall, the home shall be equipped with <br />an automatic residential fire suppression system with and may be required to <br />provide an on-site water storage tank (minimum 650-gallon capacity) and <br />water pressure booster pump, subject to the satisfaction of the Chief Building <br />Official and Fire Marshall,” and delete the last sentence regarding the <br />underground location and maintenance of the water tank. <br /> <br />6.Modify the second sentence of Condition No. 65 to read as follows: “The <br />following requirements shall be incorporated into the project, and shall be <br />consistent with the recommendations of the geotechnical reports per Exhibit A, <br />which will ensure that whatever drainage or stormwater requirements are in <br />concert with those geotechnical concerns as far as slides.” <br /> <br />7.Add the language “subject to review and approval by the City Engineer” at the <br />end of Conditions 65.a. and 65.d. regarding sizing designs criteria for <br />stormwater runoff treatment and location of roof drains discharge, <br />respectively. <br /> <br />8.Add the standard conditions for green building requirements and special <br />inspections. <br /> <br />9.Add the standard condition that the applicant has up to two one-year <br />extensions to the design review approval after the one-year time period. <br />Commissioner Pearce seconded the motion. <br /> <br /> <br />ROLL CALL VOTE: <br /> <br />AYES: Commissioners Blank, Narum, Olson, and Pearce. <br />NOES: Commissioner Fox. <br />ABSTAIN: None. <br />RECUSED: None. <br />ABSENT: None. <br /> <br />Resolution No. PC-2007-27, approving PDR-599, was entered and adopted as <br />motioned. <br /> <br />PLANNING COMMISSION MINUTES May 23, 2007 Page 15 of 20 <br /> <br /> <br />