My WebLink
|
Help
|
About
|
Sign Out
CCMIN120605
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
2000-2009
>
2005
>
CCMIN120605
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 10:56:42 AM
Creation date
12/1/2005 2:15:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
12/6/2005
DOCUMENT NO
CCMIN120605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />for the Iron Horse Trail Phase II project which would construct a pedestrian jogging trail from <br />Mohr Avenue to Santa Rita Road along the existing, abandoned transportation corridor, <br />scheduled for completion in March 2006; and (3) agenda item 4m, Pearl Harbor Remembrance <br />Day, December 7. <br /> <br />It was moved by Mr. Brozosky, seconded by Mr. Thorne, that the following actions <br />under the Consent Calendar be taken with the amendments to the minutes of November <br />15 as requested by Mr. Thorne and Mr. Brozosky: <br /> <br />a. Approved the minutes of 11/15/05 with amendments. <br /> <br />b. Actions of the Zoning Administrator and Planning Commission. (IR 05:060) <br />There was no action taken or required on this item. <br /> <br />c. Accepted monthly disbursements and Investment Report for October 2005. (SR 05:324) <br /> <br />d. Approved replacement of ten traffic signal control cabinets from Econolite Control <br />Products, Inc. (SR 05:334) <br /> <br />e. Approved a consultant agreement with Bellecci & Associates to provide engineering <br />services for the design of Vineyard Avenue Median Streetscape Improvements, the <br />rubberized asphalt pavement overlay project and the removal of two traffic roundabouts, <br />CIP Nos. 055003 and 048051. (SR 05:317) <br /> <br />f. Approved a lease agreement with Ether Web Network LLC, to locate wireless <br />communications equipment at 9000 Santos Ranch Road 0Nater Reservoir and Pump <br />Station). (SR 05:246) <br /> <br />g. Approved plans and specifications, reviewed bids and awarded a construction contract <br />to McGuire & Hester of Oakland for the construction of the Iron Horse Trail Phase II, <br />Project No. 057016. (SR 05:314) <br /> <br />h. New street name for Peoolesoft Parkwav <br />Request to rename the existing Peoplesoft Parkway to Oracle Lane in Hacienda <br />Business Park. Zoning for the property is PUD-I/C-O (Planned Unit Development - <br />Industrial/Commercial-Office) District. (IR 05:061) <br />There was no action required or taken on this item. <br /> <br />i. Accepted public improvements for the Val Vista area curb, gutter and sidewalk, Project <br />No. 045019. (SR 05:328) <br /> <br />j. Accepted public improvements for the construction of a traffic signal at the intersection of <br />Bernal Avenue and Fire Station No.4 driveway, CIP No. 055006. (SR 05:310) <br />k. Accepted public improvements for Pleasanton Avenue curb and gutter replacement, <br />Project No. 015031. (SR 05:338) <br /> <br />I. Adopted Resolution 05-087, a resolution ratifying the Mayor's appointments to various <br />City Commissions and Committees. (SR 05:339) <br /> <br />Pleasanton City Council <br />Minutes <br /> <br />3 <br /> <br />12/06/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.