Laserfiche WebLink
with KB Home for water system enhancements within the central parcel of the Bemal <br />Property; authorized the City Manager to execute the reimbursement agreements; <br />authorized the appropriation of $7,934 from the Water Replacement and Improvement <br />Fund to cover the cost of water system upgrades constructed with the Bernal Property <br />infrastructure improvements; and authorized the appropriation of $8,450 from the Streets <br />General Fund and $24,500 from the Traffic Impact Fee Fund to cover the cost of street <br />system enhancements and traffic signal interconnect upgrades constructed with the <br />Bernal Property infrastructure improvements. (SR 03:113) <br /> <br />Accepted the Traffic Committee Minutes for April 3, 2003. (IR 03:016) <br /> <br />Approved a reimbursement agreement with the City of Dublin for final design and <br />construction of the 1-580 at E1 Charro/Fallon Road interchange; approved an <br />appropriation of $202,700 from the Stoneridge Drive Specific Plan for the final design <br />work for the 1-580 at E1 Charro/Fallon Road Interchange project; and authorized the City <br />Manager to execute the agreement. (SR 03:121) <br />This item was discussed later in the agenda. <br /> <br />Authorized the transfer of $150,000 in Traffic Impact Fee funds currently designated for <br />the Sunol Boulevard at 1-680 southbound off ramp traffic signal project (CIP 025015) to <br />CIP 025039 for the construction of a new traffic signal at Bernal Avenue at Pleasanton <br />Avenue; authorized the transfer of $150,000 in Traffic Impact Fee funds currently <br />designated for the Sunol Boulevard at 1-680 southbound off ramp traffic signal project <br />(CIP 025015) to CIP 025040 for the construction of a new traffic signal at West Las <br />Positas Boulevard at Dorman Road; and authorized the expenditure of up to $200,000 of <br />these funds for the direct purchase of traffic signal hardware and related equipment for <br />these two traffic signal projects. (SR 03:115) <br /> <br />Approved a contract with All Traffic Date (ATD) for the collection of traffic and <br />pedestrian count data at 62 intersections for a cost not to exceed $35,000, plus at two <br />intersections near schools; approved a contract with Wiltec for the collection of traffic <br />and pedestrian count data at 63 intersections for a cost not to exceed $25,000; and <br />authorized the City Manager to execute the contracts. (SR 03:116) <br />This item was discussed later in the agenda. <br /> <br />Approved the plans and specifications for construction of parking lot improvements at <br />157 Main Street, Project No. 008034A; reviewed the bids and awarded the contract for <br />the subject project to GradeTech, Inc. for a low bid of $94,655; authorized the City <br />Manager to enter into the contract; and authorized the appropriation of $40,000 from the <br />General Fund to complete the project Improvements. (SR 03:111) <br />This item was discussed later in the agenda. <br /> <br />Adopted Resolution No. 03-040, authorizing submittal of an application (Used Oil <br />Recycling Block Grant Application) to the California Integrated Waste Management <br />Board. (SR 03:109) <br /> <br />Pleasanton City Council 3 05/06/03 <br />Minutes <br /> <br /> <br />