Laserfiche WebLink
3. Environmental assessments. <br /> <br /> 4. Additional attendance at Public Meeting, beyond the <br /> one meeting included in the scope of work. <br /> <br /> 5. Extra copies of reports. <br /> <br /> Possible categories of extra work applicable to Tasks 2 and <br />3 which may be required under Special Engineering Services are: <br /> <br /> 1. Environmental assessment assistance. <br /> <br /> 2. Preparation of additional construction bid packages. <br /> <br /> 3. Copies of contract drawings, specifications, and other <br /> documents in excess of the number specified. <br /> <br /> 4. Redesign due to interceptor pipeline alignment <br /> changes. <br /> <br /> 5. Preparation of extra construction cost estimates. <br /> <br /> 6. Assistance during bid period exceeding cost ceiling of <br /> $7,300. <br /> <br /> 7. Assistance during construction period exceeding cost <br /> ceiling of $4,700. <br /> <br /> Revised <br /> Exhibit A <br /> City of Pleasanton <br /> April 5, 1988 <br /> Page 8 of 8 <br /> <br /> <br />