c. Field verify aerial maps as compared to visible <br /> appurtenances such as manholes, valve box covers, <br /> catch basins, etc. <br /> <br />2.5--Prepare Preliminary Drawings, Specifications, and <br />Engineer's Estimates <br /> <br /> a. Prepare horizontal scale of 1 inch equals 40 foot <br /> for the plan, and vertical scale of 1 inch equals <br /> 40 foot for profile construction drawings to a <br /> completion level of approximately 35 percent. <br /> Thirty three total drawings are anticipated. <br /> <br /> b. Prepare draft technical specifications. <br /> Specifications shall refer to the City's standard <br /> specifications and the Caltrans standard <br /> specifications. <br /> <br /> c. Prepare one construction cost estimate and provide <br /> a copy of cost estimate documentation and quantity <br /> calculations. <br /> <br /> d. Prepare one set of preliminary traffic control <br /> diagrams. <br /> <br /> e. Provide five sets of preliminary plans, <br /> specifications, cost estimates and traffic control <br /> diagram for the City's review. <br /> <br />2.6--Prepare 100 Percent and Final Drawings, <br /> Specifications, and Construction Cost Estimates <br /> <br /> a. Prepare 100 percent design drawings and final <br /> draft specifications, traffic control diagrams, <br /> incorporating changes resulting from the City's <br /> comments on 35 percent submittal. <br /> <br /> b. Provide five sets of draft 100 percent plans, <br /> specifications, cost estimates and traffic control <br /> diagram for the City's review. <br /> <br /> c. Conduct one independent design review with the <br /> technical review committee. <br /> <br /> d. Prepare final drawings, specifications, and one <br /> final cost estimate. <br /> <br /> Revised <br /> Exhibit A <br /> City of Pleasanton <br /> April 5, 1988 <br /> Page 6 of 8 <br /> <br /> <br />