My WebLink
|
Help
|
About
|
Sign Out
RES 88109
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
1980-1989
>
1988
>
RES 88109
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2012 2:48:05 PM
Creation date
12/4/1999 12:15:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
3/15/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ruth and Going, Inc. R"~'G <br /> <br /> 17091-109 <br /> January29, 1988 <br /> Revised 3-11-88 <br /> <br /> FEE PROPOSAL <br /> For The City of Pleasanton <br /> Operations Service Center <br /> Busch Road, Pleasanton, California <br /> <br />I. SCOPE OF SERVICES <br /> <br /> The project consists of thirteen (13) separate and independent buildings totalling <br /> approximately 94,000 sq. ft. on a flat site of approximately 17 acres. The fees for <br /> this proposal are based upon the Schematic Drawings designed by Ruth and Going, <br /> Inc. and approved by the City of Pleasanton on December 16, 1986, Cooper and <br /> Sword Storm, Sanitary and water Master Plans (Exhibits "A", "B" and "C"-undated) <br /> and based on subsequent revisions provided to Ruth and Going, Inc. by the City of <br /> Pleasanton at meetings held on December 17, 1987, January 13, 1988, January 21, <br /> 1988 and February 9, 1988. The services include architectural, structural <br /> engineering, civil engineering, landscape architecture, surveying, mechanical and <br /> electrical engineering. <br /> <br /> A. Design Services: <br /> <br /> 1. Master Plan RevisiOn: In view of the fact that the location of the Fire <br /> Training Facility (presently under construction) is not comparable with <br /> the approved Master Plan (i.e., approximately 85 feet to the North) this <br /> proposal includes fees for modifying the Master Plan to locate the <br /> Evidence Storage Building, the Firing Range and Agility Course in a <br /> manner consistent with the intent of the approved Master Plan. <br /> <br /> 2. Pre-Desian Services: This proposal includes fees for needs assessment, <br /> design programming and schematic design for the Evidence Storage <br /> Building, Firing Range and Agilty Course. (Pre-design services for the <br /> remainder of the facilities were provided by Ruth and Going, Inc. under a <br /> previous contract.) <br /> <br /> 3. Pre-Bid and Negotiation: In view of the fact that the approved <br /> schematics specify pre-engineered steel buildings, included in this <br /> proposal are structural and architectural fees necessary to pre-bid the <br /> pre-engineered steel buildings separately and independently of any <br /> building interiors finishes and site work. This pre-bidding would occur at <br /> the end of the Design Development Phase of work. <br /> <br /> Page 1. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.