Laserfiche WebLink
214 <br /> <br /> d. Approval of plans and specifications and authorization <br /> to call for bids for Project No. 895019B, the <br /> resurfacing by heater-remix method of Touriga Drive; <br /> Blackbird Drive, from Valley Avenue to Woodthrush Drive; <br /> Crellin Road, from Touriga Drive to Zinfandel Court; <br /> Rheem Drive, from Stoneridge Drive to Oakland Avenue; <br /> and Tawny Drive, from Bernal Avenue to Touriga Drive. <br /> (SR 90:173) <br /> <br /> e. Review of the bids and award of the contract for <br /> NPID3-9003, the abandonment and relocation of five <br /> monitoring wells located within the Hacienda Drive/I-580 <br /> Interchange right-of-way to Pitcher Drilling Company of <br /> Palo Alto for a bid of $23,304.30. (SR 90:175) <br /> <br /> f. Approval of Amendments No. 7, 8, and 9 to the contract <br /> with CH2M Hill for the preliminary and final design and <br /> services during construction of the Hacienda Drive/I-580 <br /> and Santa Rita Road/I-580 Interchanges and of Amendment <br /> No. 9 to the contract with CH2M Hill for the design of <br /> the Stoneridge Drive/I-680 Interchange, and <br /> authorization of a total expenditure of $1,114,006.28 <br /> from NPID No. 3 to cover the cost of these Amendments. <br /> (SR 90:176) <br /> <br /> g. Adoption of Resolution No. 90-85, approving the <br /> appropriation of excess funds in the amount of <br /> $2,939,173 to a Contingency Reserve. (SR 90:181) <br /> <br /> h. Review of bids and award of contract for Project No. <br /> 885005, the construction of landscape improvements to <br /> all the median islands on Del Valle Parkway, between <br /> Hopyard Road and Main Street; to Hopyard Road, on the <br /> north side between the Zone 7 administration building <br /> and the Arroyo Mocho; and to the two small parkway <br /> strips on Valley Avenue near Northway Road, to Mori <br /> Hatsushi and Associates, Inc., for a bid of $164,035. <br /> (SR 90:170) <br /> <br /> i. Approval of plans and specifications and authorization <br /> to call for bids for Project No. 875010, the median <br /> landscaping for Bernal Avenue, north of Kottinger Drive. <br /> (SR 90:171) <br /> <br /> j. Review of bids and award of contract for Project <br /> No. 885082, the construction of two soundwalls on the <br /> east side of 1-680 between the Pleasanton Canal and <br /> Stoneridge Drive, to McGuire and Hester Contractors of <br /> Oakland for a bid of $1,691,691. (SR 90:177) <br /> <br /> k. Acceptance of public improvements for Project No. <br /> ADS6-1, the extension of Valley Avenue in a four-lane <br /> configuration from Quarry Lane southeasterly to Stanley <br /> <br /> - 2 - <br /> 5-1-90 <br /> <br /> <br />