Laserfiche WebLink
42 <br /> <br /> Ms. Acosta pointed out the process was just beginning. <br /> <br /> Mr. Tarver indicated he did not support a 1400 ft. cul de sac <br /> and agreed there were safety issues in connection with a street at <br /> the top of a hill. He was glad to see Mr. Hatsushi and the <br /> neighbors willing to work together. <br /> <br /> Ms. Mohr asked when the Study could be complete. <br /> <br /> Mr. Swift believed it would be six to eight months before <br /> final consideration of an EIR for the Corridor Study. There have <br /> been many meetings already, but these people can be included in the <br /> process immediately. <br /> <br /> Mr. Tarver asked when there would be a resolution of the left <br /> over parcel and how long will it sit in its current state. <br /> <br /> Mr. Swift indicated that if the parcel were designated as a <br /> park it would be a very long time before improvements could be <br /> made. Development of a park in conjunction with development of <br /> that area is a number of years out. <br /> <br /> Mr. Butler indicated he was prepared to take action on this <br /> matter and could not support any resolution to eliminate potential <br /> access. He agreed with the staff that more than one connection was <br /> necessary. The issue of how long the land stays bare is minor _ <br /> compared to solving the problem. If this can be included in the <br /> study and all parties work together for the best answer, that is <br /> more important than landscaping now. He further indicated the <br /> property was inadequate for a park by itself. <br /> <br /> It was moved by Ms. Mohr, seconded by Ms. Scribner, to take no <br /> action with respect to this piece of property until the Specific <br /> Plan for Vineyard Avenue with neighborhood participation, is <br /> prepared. <br /> <br /> The roll call vote was as follows: <br /> AYES: Councilmembers Butler, Mohr, Scribner, Tarver and Mayor <br /> Mercer <br /> NOES: None <br /> ABSENT: None <br /> ABSTAIN: None <br /> <br /> Item 12b <br /> Analysis of State Budqet Reduction and Impacts on Pleasanton <br /> (IR92:69) <br /> <br /> Council accepted the staff report. No action was required or <br /> taken. <br /> <br /> 9/15/92 16 <br /> <br /> <br />