My WebLink
|
Help
|
About
|
Sign Out
CCMIN070996
City of Pleasanton
>
CITY CLERK
>
MINUTES
>
1990-1999
>
1996
>
CCMIN070996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 10:53:45 AM
Creation date
5/13/1999 10:33:46 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
7/9/1996
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The r011 call vote was as follows: <br />AYES: Councilmembers - Dennis, Michelotti, Pico, and Mayor Tarver <br />NOES: Councilmember Mohr <br />ABSENT: None <br />ABSTAIN: None <br /> <br />Item 6d <br />Ext¢~ign of Bernal Corporate Park Development Agreement. (SR96: 190) <br /> <br /> Brian Swift presented the staff report. <br /> <br /> Mr. Tarvet asked if there were other provisions coming along or does this provision get <br />the park fees. <br /> <br /> Mr. Swift stated the park fees are already paid. This is the last thing he is aware of. <br /> Mayor Tarver declared the public hearing open. <br /> <br /> Jim Gresham 711 Koll Center Parkway, representing Bernal Corporate Park, indicated <br />he was in agreement with the staff report and was available to answer questions. <br /> <br /> Mr. Tarvet recalled there were a number of requests, including the left turn into the <br />business park, sewer reservation extension, and terms of the agreement extended. Were all <br />those included in this request. <br /> <br /> Mr. Swift indicated the sewer issues were resolved in a previous contract which also <br />included a mechanism to pay the park fees for the existing property and future development <br />within the business park. That agreement has now been executed. The left turn item is a <br />separate issue that will ultimately be before Council for review. The traffic engineering division <br />is currently working on that. There was also a request of city staff to combine that traffic light <br />with the signalization of the northbound off ramp at 680/Bernal. <br /> <br /> Mr. Gresham felt the previous agreement covered all those items and this extension is <br />the only remaining issue. <br /> <br /> Ms. Acosta indicated there was some question about the left turn signalization but the <br />agreement would be reviewed. <br /> <br /> There being no further testimony, the public hearing was closed. <br /> <br />07/09/96 -12- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.