Laserfiche WebLink
Mr. Homolka said the part the City is building is only part of the interchange and it only <br />eliminates the eastbound access. It still retains the westbound for now. When the Altamont is <br />built that also will be gone. <br /> <br /> Mr. Pretzel said the consultants are using the 1-580/I-680 master plan that helps solve the <br />problem for the northbound traffic. He hoped that Caltrans will accept the plan. The City will <br />not be eliminating any access that Caltrans has not talked about eliminating. The funding should <br />be considered part of the 1-580/1-680 master plan. He felt the safety issues should be considered <br />and studied. He believed people do not drive Highway 84 because it is a dangerous road. The <br />interchanges do not include any mitigation for safety issues. He said before a decision is made <br />on whether an interchange should be built, safety and mitigations need to be studied. He <br />estimated that 1400 school children would need to cross twice daily in front of the interchange. <br /> <br /> Ms. Michelotti asked to review the plan of Stoneridge Drive during the fourth phase and <br />what happens with Caltrans and how the plan is alike and different. <br /> <br /> Mayor Tarver asked what the weave would be like for people getting on the freeway at <br />Stoneridge to go west to 1-680 to go north and those getting off 1-680 to 1-580 to go west. <br /> <br /> Mr. Homolka said the off ramp will allow traffic to go both east and west. All 1-580 <br />bound traffic is in the scenario. <br /> <br /> Mayor Tarver said all the traffic coming off 1-580 is lost. <br /> <br /> Mr. Homolka said yes, in this scenario. He said essentially there will be a flyover that <br />goes from southbound to eastbound. Presently that is done with a loop. Take the loop out and <br />replace it with a flyover. The flyover eliminates a weave allowing traffic to go directly onto the <br />freeway and one of the off ramps will be expanded. Other phases eliminate the opposite loops <br />and there is a Dublin interchange being added sometime in the future. The northbound to <br />westbound loop is being replaced with a flyover. He described the route he would have to take <br />to go from Pleasanton to Dublin. <br /> <br /> Ms. Michelotti said if she was at the Stoneridge Mall when would she be able to go <br />eastward. <br /> <br /> Mr. Homolka said in the ultimate buildout she would not be able to go eastward. She <br />would have to go to Hopyard or Foothill to access the freeway. <br /> <br /> Mayor Tarver asked when the second phase would begin. <br /> <br /> Mr. Homolka said Caltrans has requested the funds for the second phase. <br /> <br />Pleasanton City Council 5 05/21/98 <br /> <br /> <br />